Laserfiche WebLink
I I A <br />A 01m 4 MIT 0 <br />Project Name Ravina Park — Bowman Creek Stabilization <br />Project No. 117-073A <br />For Bids Due July 10th, 2018 <br />PART I <br />(Must be completed for all bids, Please type or print) <br />#4Ae'C <br />Date: Bidder (Firm): WjWAMS'LZ9A—rW- HA HE, <br />Address: 'q6ZO SE CA.77Y <br />City/State/Zip: 7a,,yq&EL1> *, jt4 q4166 Telephone Number: ( 31q <br />Agent of Bidder (if Applicable): ova <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />�Fpm#M-RIYC - <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />to <br />and dated APUIL, .0%16 ; WJeor the sum of (enter the Totall Bid as shown on, the Proposal) <br />SeVOJ :4� $ ;211 1710 , 00 <br />(Enter sum of Total Base Bid plus Alternates shown on Proposal) Numerical) <br />The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in <br />the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in, accordance <br />with the notice. Any addenclums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that <br />shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit <br />basis, the itemization of the units shall be show e attachnWM---) <br />By <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />The above bid is accepted this day of <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Suzanna M. Fritzberg, Member <br />Elizabeth A. Maradik, Member Therese J. Dorau, Member <br />James A, Mueller, Member Attest: Linda M. Martin, Clerk <br />Version 10/17/2017 Contractor's Bid for Public Works - 28 <br />