Laserfiche WebLink
3. The contractor shall place top soil to a depth of 4 inches in all areas called for seeded lawn. <br />a. A pH test is required to be run before top soil is brought on site. <br />4. Measurement and Payment <br />a. Payment for all costs of installing the Sodding, Nursery and Topsoil, including the cost <br />of all materials, equipment, tools, labor, transportation, operations, and all other <br />incidentals, shall be paid for on an square yard basis for Pail C under the pay items: <br />BACKFILL, TOPSOIL ........ ................. ................................ .CYD <br />.PART 3 -- CONSTRUCTION DOCUMENTS <br />3.01 NONE <br />JONES PETRIE RAFINSKI <br />(", (I v <br />C ' Chockley, RL <br />Registered Landscape Architect <br />END OF ADDENDUM <br />�0� �S C H O C "���•i <br />- ND. <br />* 20500170 <br />STATE OF = �- <br />�l 11 tf 1111�5�� <br />Cq pE ARC\ .&0 <br />8L signed copy of this addendum shall be submitted with the pro <br />Acknowledged by: <br />�Signatureer <br />Ravina Park Bowman Creek Stabilization <br />July b, 2018 <br />Date <br />I/q' L <br />Addendurn # I <br />Page 2 <br />