BID/PROPOS,AL
<br />CITY OF SOUTH BEND
<br />PROJECT' NAME: Off -Street Parking Lot at Wayne St. and
<br />St. Louis Blvd.,
<br />PROJECT NUMBER: 117-083B
<br />FOR BIDS DUE: July 10, 2018
<br />Item No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1.
<br />Construction Engineering
<br />1
<br />LS
<br />6,046.95
<br />$6,046,95
<br />2.
<br />Mobifization/Demobilization
<br />I
<br />LS
<br />19,800.00
<br />$19,800.00
<br />3.
<br />CPM Schedule
<br />1
<br />LS
<br />360.00
<br />$360.00
<br />4.
<br />CPM Monthly Update
<br />7
<br />MO
<br />50,00
<br />$350.00
<br />5,
<br />Clearing Right of Way
<br />1
<br />LS
<br />7,600.00
<br />$7,600,00
<br />6.
<br />Tree, Remove, 48"
<br />1
<br />EACH
<br />2,800.00
<br />$2,8010.00
<br />7.
<br />Concrete Pavement Removal
<br />125
<br />SYD
<br />11.00
<br />$1,3,75.00
<br />8.
<br />Sheet Sign, Relocate
<br />3
<br />EACH
<br />179.00
<br />$537.00
<br />9,
<br />Inlet Protection
<br />5
<br />EACH
<br />65.00
<br />$325.00
<br />10.
<br />Temporary Erosion and Sediment Control
<br />1
<br />LS
<br />550.00
<br />$550.00
<br />11.
<br />Common Excavation
<br />2,790
<br />CYD
<br />35.50
<br />$99,045.00
<br />12.
<br />Compacted Aggregate for Base, No. 53
<br />1,280
<br />TON
<br />26.00
<br />$33,280.00
<br />13.
<br />HMA Surface, 9.5 mm, Type B
<br />310
<br />TON
<br />103.00
<br />$31,930.00
<br />14,
<br />HMA Intermediate, 119.5 mm, Type B
<br />520
<br />TON
<br />67,00
<br />$34,840.00
<br />15.
<br />Sidewalk, Concrete, 4"
<br />15
<br />SYD
<br />153.00
<br />$2,295.00
<br />16.
<br />Concrete Curb, 6"
<br />1,096
<br />LFT
<br />40.00
<br />$43,840.00
<br />17.
<br />PCCP for Approaches, 6"
<br />68
<br />SYD
<br />80.00
<br />$5,440,00
<br />18.
<br />Sodding
<br />425
<br />SYD
<br />12.95
<br />$5,503.75
<br />19, �Mulched
<br />Seeding, Type U
<br />160
<br />SYD
<br />1196
<br />$2,073.60
<br />20.
<br />Tree, Freeman Red Maple, 2.5"
<br />3
<br />EACH
<br />560.00
<br />$1,680.00
<br />21.
<br />Tree, Shumard Oak, 2.5"
<br />11
<br />EACH
<br />555.00
<br />$6,105.00
<br />22.
<br />Dumpster Enclosure
<br />1
<br />LSUM
<br />4,900.00
<br />$4,900.00
<br />23.
<br />Storm Sewer Pipe, 18", Perforated
<br />339
<br />LFT
<br />69.00
<br />$23,391 .00
<br />24,
<br />Standard Drywell, 1,800 gallon
<br />5
<br />LFT
<br />I-
<br />6,600.00
<br />$33,000.00
<br />25. '2"
<br />PVC Schedule 80, with Pull Rope
<br />220
<br />LFT
<br />4.98
<br />$1,095,60,