Change Order Nos. 1,2,4,5,6 - INDOT - Boland Trail Project No 113-047
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order Nos. 1,2,4,5,6 - INDOT - Boland Trail Project No 113-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 10:22:10 AM
Creation date
7/11/2018 11:05:01 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract NOR -36881 INDIANA Date:07/09/2018 <br />Change Order No:002 Department of Transportation Page: 3 <br />Contract: R -36881 <br />Project: 1382758 - State:1382758001-C4 <br />Change Order Nbr: 002 <br />Change Order Description: Road closure 6 weeks extension and $30,000 credit <br />Reason Code: INCENTIVEIDISINCENT, Closure Times <br />,. <br />CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change <br />0130 138275E 0127 108-08222 DOL 30,000.000 -1.000 C Amount:$-30,000.00 <br />Item Description: INCENTIVEID(SINCENTIVE <br />Supplemental Descriptionl: <br />Supplemental Descriptionl: <br />Total Value for Change Order 002 = $-30,000.00 <br />Milestone Time Adjustment <br />MileStone Nbr: 03 <br />Milestone Description: CLOSURE TIME <br />Original Completion dt: 04119/2018 Adj camp[ dt 05/31/2018 Adj No. of Days 42 <br />Explanation: Increase road closure for project safety and increased efficiencies. <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the fol[owing change is recommended. <br />General or Standard Change Order Explanation <br />The contract allows for a 21 day road closure period. The intent of the closure is to allow for the storm sewer to be installed under the roadway <br />and preform the other work adjacent to the roadway. HRP proposes a deduct change order in order to increase the road closure period. They are <br />offering 30000 dollars for additional six weeks of the full road closure. They feel it will make the project safer and likely allow It to be completed <br />sooner due to increased efficiencies. <br />Change Order Explanation for Specific Line Item <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor: <br />Signed By: <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />