My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos. 1,2,4,5,6 - INDOT - Boland Trail Project No 113-047
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order Nos. 1,2,4,5,6 - INDOT - Boland Trail Project No 113-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 10:22:10 AM
Creation date
7/11/2018 11:05:01 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:R -36881 INDIANA <br />Change Order No:001 Department of Transportation <br />Date:06I2912018 <br />Page: 3 <br />Contract: R -36881 <br />Project: 1382758 - State: 138275800LC4 <br />Change Order Nbr: 001 <br />Change Order Description: Design change of Structural Backfili type <br />Reason Code: CHANGED COND, Constructability Related <br />C L N PCN PLN Item Code Unit Unit Price Co aty Comment Amount Change <br />0025 1382758 0025 211-09265 CYS 35.000-509.000 C Amount:$-17,815.00 <br />Item Description: STRUCTURE BACKFILL, TYPE 2 <br />Supplemental Descriptionl: <br />Supplemental Description2: <br />0115 1382758 0115 211-09264 CYS 35.000 509.000 C Amount:$ 17,815.00 <br />Item description: STRUCTURE BACKFILL TYPE 1 <br />Supplemental Descriptionl: <br />Supplemental Description2: <br />Total Value for Change Order 001 = $ 0.00 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />Design change to change structural backfill type 2 to type 1 due to the native material is sufficient material. <br />Change order Explanation for Specific Line Item <br />************kk:Yhit4xk:Yh..... ..Ytkkfh r+Fkk:whxxdtxk:Yxwkx%k.**..xzfk*xxRfxk*--..xx*#x*x*x*k****wk***ir*kk*k**k**k****k**k**kk*k <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor: <br />Signed By: <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.