Laserfiche WebLink
Contract NOR -36881 INDIANA <br />Change Order No:005 Department of Transportation <br />Date:0710912018 <br />Page: 6 <br />Explanatiow HRP requested 60 work days for the work associated with adding a gravity wall. That equals 87 calendar days when the <br />INDOT holidays of Labor Day, Columbus Day, and Veterans Day are figured in. We are counting on being allowed to <br />work the Friday prior to these Monday holidays. We feel strongly the 87 calendar days should be added to the existing <br />intermediate completion date of August 24, 2018 for a new intermediate completion date of November 19, 2018. <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />The accidental discovery on April 20th lead to a redeslgn of the path adjacent to the Cemetery. The current design proposed the ground between <br />the path and the edge of the Cemetery to be sloped at 1.7 to 1 with a Geocell system. The new design proposes a gravity block wall system <br />along with additional drainage item. And the path with be located adjacent to the road with curb and gutter buffer. <br />Change Order Explanation for Specific Line item <br />}ti#iii#i##ii#i#i###i##iii****ii**k*****k*k**i**********i*i#iiiii}*i*ifi#kfifi*fi##*k#**kfi#**##itii#i#iiiiiiii}i}}ii <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor: <br />Signed By: <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />