My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos. 1,2,4,5,6 - INDOT - Boland Trail Project No 113-047
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order Nos. 1,2,4,5,6 - INDOT - Boland Trail Project No 113-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 10:22:10 AM
Creation date
7/11/2018 11:05:01 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:R -36881 INDIANA Date.-06/29/2018 <br />Change Order No:004 Department of Transportation Page: 4 <br />Supplemental Description2: <br />0116 1382758 0114 807-02194 EACH 7,812,000 1.00C <br />Item Description: SERVICE POINT II MODIFIED <br />Supplemental Descriptionl: ELECTRICAL SERVICE. POINT, TESCO, SINGLE METER <br />Supplemental Description2: <br />0117 1382758 0112 805-11597 EACH 14,185.070 1.000 <br />Item Description: ACCESSIBLE PEDESTRIAN SYSTEM <br />Supplemental Descriptionl: WIRELESS CROSSWALK, PEDESTRIAN SYSTEM <br />Supplemental Description2; <br />0118 1382758 0111 805-04973 LFT 11.720 125.000 <br />Item Description: CONDUIT <br />Supplemental Descriptionl: CONDUIT, HDPE, 3 IN. SCHEDULE 80 <br />Supplemental Description2: <br />C Amount:$ <br />C Amount:$ <br />C Amount:$ <br />7,812.00 <br />14,185.07 <br />1,465.00 <br />Total Value for Change Order 004 = $ 26,291.03 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />In order to match the South Bends lighting cabinets, the cabinets called out in the plans will need to be switched to the City standard cabinet. The <br />plans reflected two pole mounted service points. The service point was relocated to the middle of the project and in turn the PED crosswalk <br />system is changed to a solar wireless system for cost savings and not running a separate circuit from the new cabinet location. No additional time <br />is needed. <br />Change Order Explanation for Specific Line Item <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor: <br />Signed By: <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.