My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - 2018 Curb and Sidewalk Construction Proj No 118-007 - Rieth Riley & Premium Concrete
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Award Bids
>
Award Bid - 2018 Curb and Sidewalk Construction Proj No 118-007 - Rieth Riley & Premium Concrete
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 11:36:48 AM
Creation date
7/11/2018 10:59:31 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL Wy ffAl <br />CITY OF SOUTH BEND <br />1865 <br />Project Name 2018 Curb and Sidewalk Construction <br />Project No. 118-007 <br />For Bids Due June 26th, 2018 at 9:30 am Local Time <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />807 <br />Sy <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />818 <br />Sy <br />3 <br />CONCRETE CURB, REMOVE <br />1017 <br />LF <br />4 <br />CONCRETE CURB, MODIFIED <br />1017 <br />LF <br />41(), 6;,,g�lo 5XII - <br />5 <br />6 <br />CONCRETE APPROACH, REMOVE <br />PCCP FOR APPROACHES, 64N <br />102 <br />79 <br />SY <br />Sy <br />„' "- <br />r z> 52-1- <br />7 <br />TOPSOIL AND SEEDING <br />783 <br />SY <br />10 <br />TREE, REMOVE, 18 IN <br />4 <br />EA <br />11 <br />TREE, REMOVE, 30 IN <br />3 <br />EA <br />12 <br />TREE, REMOVE, 48 IN <br />I <br />EA <br />14 <br />STEMPLANT, DECIDU2.5OUS TREE, SINGLE <br />, 24 N TO IN <br />8 <br />EA <br />24 <br />115 <br />CURB RAMP, REMOVE <br />39 <br />SY <br />16 <br />ONE-WAY PERPENDICULAR CURB <br />RAMP <br />216 <br />SY <br />2 <br />2, <br />18 <br />PAIRED PERPENDICULAR CURB RAMP <br />23 <br />Sy <br />21�- <br />19 <br />REMOVAL, MULBERRY BRUSH, 60-INCH <br />1 <br />EA <br />d10 0 V <br />DIVISION Al TOTAL# <br />Q LTJ 61] [Q MIMI <br />Item <br />No. <br />Description <br />I <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />I <br />CONCRETE SIDEWALK, REMOVE <br />150 <br />SY <br />!:5-L <br />3, (iev <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />150 <br />SY <br />o A)51 <br />3 <br />CONCRETE CURB, REMOVE <br />158 <br />LF <br />2. �'12 <br />3- V 16, <br />4 <br />CONCRETE CURB, MODIFIED <br />158 <br />LF <br />5 <br />CONCRETE APPROACH, REMOVE <br />34 <br />SY <br />dv <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />34 <br />Sy <br />y,2 <br />7 <br />TOPSOIL AND SEEDING <br />76 <br />SY <br />9 <br />TREE, REMOVE, 10 IN <br />1 <br />EA <br />-2cRp -0� <br />10 <br />TREE, REMOVE, 18 IN <br />2 <br />EA <br />R%b <br />'t 2co <br />11 <br />TREE, REMOVE, 3,0 IN <br />I <br />EA <br />2etv <br />1006 <br />13 <br />STUMP, REMOVE <br />3 <br />EA <br />c" a <br />,—e <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2-IN TO 2.5 IN <br />4 <br />EA <br />15 <br />CURB RAMP, REMOVE <br />11 <br />SY <br />18 <br />PAIRED PERPENDICULAR CURB RAMP <br />11 <br />SY <br />DIVISION A2 TOTAL <br />Bidder (Firm): <br />Version 10/17/2017 Contractor's Bid for Public Works - 7 <br />ADDENDUM # <br />
The URL can be used to link to this page
Your browser does not support the video tag.