My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - McCormick Engineering LLC - Bowen Street Drainage
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment No 2 to PSA - McCormick Engineering LLC - Bowen Street Drainage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:23:05 AM
Creation date
7/11/2018 10:57:25 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Client: City of South Bend Board of Public Works <br />Bowen Street Drainage Improvements - Amendment 2 - Manhour Justification <br />Revision Date: 6/19/2018 <br />RevWons Per;Addendum No 2 <br />Additional <br />Additional <br />Task <br />Hours <br />Rate <br />Amount <br />Geotechnical Services for Phase 3 <br />------------------ <br />•------------------------------------------------------------------------------------------------------------------------------ <br />Geotechnical review and recommendations for permanent haul road improvem <br />-- --- <br />N/A <br />------ ----------- <br />-------- ---------- <br />$ <br />-_7_OD0.00 <br />--------------------- •---------------------------------------------------------------------------------------- <br />Subtotal Survey and Geotechnical Services <br />$ <br />7,000.00 <br />Phase 3 - Ireland Road Drainage Improvements <br />------------------------------------------------------------------------ --------------------------------- <br />-------------------------- <br />-- ------- --- <br />Contract Document Preparation ___-__---------___-_____ <br />_ .----------- <br />---------------- <br />._------- --- <br />- ------- ------- -------- ----- -.._...--- ----------- --------- --- ---- ----. <br />Permanent Access Road Design Layout & Design - - <br />--------------------- <br />- -- -- W-- <br />SO- <br />$-135.00-T <br />----- <br />$ <br />-6,750.00 <br />- - <br />---------------------- ------------------------------------------- <br />Drive Design Layout & Design <br />20 <br />$ 135.00 <br />$ <br />2,700.00 <br />-Maintneance - -------------------------------------------------------------------------------------------- <br />Haul Road Plan Preparation <br />80 <br />$ 135,00 <br />$ <br />10,800.00 <br />Technical Specification Preparation -- ----------------- - -- <br />---------------- <br />24- <br />- <br />$----- 135.00 <br />$--___3_240.D0- <br />--------------------------------------- ----- - ------------ <br />Additional gwner Coordination <br />16 <br />$ 135.D0 <br />$ <br />2,160.00 <br />------ - <br />Subotal - Engineering Services for Phase 3 <br />$ <br />25,650.00 <br />Subtotal Engineering and Geotechnical Services Phase 3 <br />$ <br />32,650.00 <br />Survey and Geotechnical Services for Phase 4 <br />---------------------------------- <br />------- <br />------------------------------------- ----------------------------------------------------------------..-- <br />Topographic Survey by Abonmarche------------ <br />------------------------------ <br />W- -N/A- ------------------------------------------- <br />$ <br />3,000.00 <br />Subtotal Survey Services <br />$ <br />3,000.00 <br />Phase 4 - Miami Basin Automated Valve Improvements <br />5coping of City Desired ImprovementsTTTT^^ - -------------------------------------------------- <br />_-_-T10 <br />$-135.00 <br />-------------------- <br />$ <br />1,350.00 <br />- - - <br />Survey Coordination <br />20 <br />$ 135,00 <br />------- <br />- ---------OQ <br />$ <br />2,700.00 <br />---------- <br />---------------------------------------------------------------------------------------------------------------- <br />---- -i--- Utility Coordination <br />12 <br />1-3- <br />$5. <br />$ <br />1,620.00 <br />Coordination with Manufacturer <br />•------------------- -------------------------------- ---------------------------------------------------------------......_----------------------------- <br />Panel and/or Electrical Improvements --------- ------- <br />- - - - <br />24 <br />$135.00-_ <br />- ______ <br />$ <br />T 3,240.00 <br />---- ---------------------------------------------------------------------------- <br />Valve Actuator Improvements ------------------------ - -- <br />---------------------------- <br />16 <br />$ 135.00 <br />- ---------------------- <br />$ <br />2,160.00 <br />------------ --------- --- ---------------------------- ---- <br />Remote Sensor improvements______ _ ___________ --------------------------------- <br />____---- <br />16 <br />$------135.00 <br />-------------------- <br />$ <br />2,160.00 <br />--- <br />Structure Elevation Impprovements to Elevate Actuator <br />24-$_-_-_-135.00TTT$ <br />3,,240_00 <br />.__-.....------------------e---------_.....------_------------------____-_-_..------------------- - <br />Coordination of valve sensor communication with ex City facilities <br />- ------ <br />_ <br />4O- <br />$- _- 135.D0 <br />$ <br />_ - <br />_ 5,40Q.00- <br />Contract Document Preparation <br />Preparation----------- --------- -----------------__ <br />50. <br />$_-__ 135A0 <br />$ <br />6------D <br />---Plan <br />--------- <br />Performance Based Technical Specification Preparation . _-____--------------__-__ <br />_ ._-- <br />24 <br />------ <br />$______135_00 <br />$- <br />3,240.00- <br />-------- ------- ------- ---------- -...---------------------------- <br />Preparation of Bid Documents <br />8 <br />$ 135.00 <br />- - ---------- <br />$ <br />1,080.00 <br />------------ <br />-------------------------------------------------------........,_-----------------------------_...__-_-_-__------------___-_ <br />Preparation of Cost Estimates <br />8 <br />$ 135.00 <br />$ <br />1,080,00 <br />---------------- --------------------------------------------------------.._..--------------------------------------------------- <br />Owner Coordination <br />24 <br />$ 1 35 .00 <br />$ <br />3,240.00 <br />Construction Administration Support - Shap Drawing Review <br />8--$ <br />-----135_00-- <br />$-^ <br />1,080.00 <br />Construction Administration Support - Progress Meetings <br />4 <br />$ 135.00 <br />$ <br />540.00 <br />Subotal - Engineering Services for Phase 4 <br />$ <br />39,880.00 <br />Subtotal Survey, Engineering and Geotechnical Services Phase 4 <br />$ <br />41,880.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.