My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - McCormick Engineering LLC - Bowen Street Drainage
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment No 2 to PSA - McCormick Engineering LLC - Bowen Street Drainage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:23:05 AM
Creation date
7/11/2018 10:57:25 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMENDMENT'No. 2 <br />Dated as of,RL\�A 1 V 2018 <br />to <br />AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES <br />by and between <br />Board of Public Works, City of South Bend, Indiana ("Owner") <br />and <br />McCormick Engineering, LLC ("Engineer") <br />For <br />Bowen Street Drainage Improvements ("Project") <br />This Amendment amends, modifies and supplements the Agreement between Owner and Engineer for <br />Professional Services (the "Agreement"). The Agreement, whether or not it is attached to this Amendment, is <br />hereby incorporated into this Amendment by this reference and is made part hereof as if it were fully set forth <br />herein. The amendments, modifications and supplements to the Agreement contained in this Amendment are <br />set forth by reference Section number contained in the Agreement. Unless a part of the Agreement is amended, <br />modified or supplemented by this Amendment, the Agreement shall remain in full force and effect. <br />Engineer's Additional Services under this Agreement: <br />• Layout and integration of an additional permanent maintenance road into the Facility from the Miami <br />Street Right -of -Way. <br />• Geotechnical engineering services needed to incorporate the newly proposed permanent maintenance <br />road into the design of the facility <br />• Reconfiguration of access drive for maintenance of existing water quality structures <br />• Preparation of revised design Plans and Contract Documents to remove accumulated sediment from the <br />basin known as the "Miami Basin" as well as provide additional surface stabilization measures <br />• Coordination and preparation of Contract Documents to provide improvements to an existing <br />automated valve that will result in: <br />o Elevation of the actuator motor above the existing ground surface <br />o A new actuator motor with improved manual flywheel orientation <br />o Reestablishment of electrical connections to actuator motor <br />o Remote sensing of levels and/or flows from the Miami Basin <br />o Ability to open and close the valve by means of the actuator motor from remote facilities by the <br />City <br />1.01 Basic Agreement and Period of Service <br />B. Engineer shall complete its services within a reasonable time, or within the following specific <br />time period: The Engineer shall make every effort to complete the portion of the Work needed <br />to solicit Contractor bids within three months from the Effective Date of Amendment 2. <br />7.01 Basis of Payment <br />l of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.