My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6. F (7) Res. 2850 Master Agency Agreement (Mayflower Realignment)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
02-22-11 Packet
>
6. F (7) Res. 2850 Master Agency Agreement (Mayflower Realignment)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 1:53:29 PM
Creation date
2/18/2011 1:53:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
vfi~ <br />Lunch, E-/arne~r cS~ ~1 ssociates, Inc. <br />Land Surveyors ~ Professional Engineers <br />Landscape Architects ~ Land Planners <br />Office (574)234-4003 / (800)594-4003 ~ Fax: (574)234~F009 <br />1643 Commerce Drive • South Bend, IN 46628 <br />March 1, 2010 <br />Revised March 10, 2010 <br />Mr. Bill Schalliol <br />Planner <br />Community and Economic Development Department <br />City of South Bend <br />12t Floor County-City Building <br />22'7 West Jefferson Blvd. <br />South Bend, Indiana 46601 <br />RE: Proposal for Planning Services, Survey Services and <br />Engineering Services to prepare Street Vacation Documents and <br />Construction Plans for the Realignment of Mayflower Road from <br />Cleveland Road to Brick Road and Signalization Plans for the <br />Mayflower Road-Cleveland Road Intersection, South Bend, Indiana. <br />Dear Mr. Schalliol: <br />Danch, Harner & Associates, Inc. (DHA) is pleased to submit this proposal for <br />professional Planning, Surveying and Engineering services to provide road and storm <br />drainage construction glans for the realignment of Mayflower Road from Cleveland to <br />Brick Roads. Services would also include providing a Traffic Impact Analysis Study for <br />the proposed signalization of the Mayflower Road and Cleveland Road intersection and <br />preparation of a Signalization Plan for said intersection by a Traffic Engineer. Planning <br />services would include preparing Street Vacation documents and representation at public <br />hearings for the vacation of a portion of the southern end of the existing Mayflower Road <br />right-of--way between Brick Road and Cleveland Road. <br />Our design team will include Traffic Engineering Consultants, PC of South Bend, Ken <br />Herceg & Associates, Inc. of South Bend and Alt & Witzig of South Bend. <br />We anticipate the following scope of services will be provided by DHA and our <br />consultants: <br />
The URL can be used to link to this page
Your browser does not support the video tag.