My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6. F (7) Res. 2850 Master Agency Agreement (Mayflower Realignment)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
02-22-11 Packet
>
6. F (7) Res. 2850 Master Agency Agreement (Mayflower Realignment)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 1:53:29 PM
Creation date
2/18/2011 1:53:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• IDEM SWPPP approval. <br />• CDR Foundation Construction Design Release <br />• Bid documents other than sealed Construction Plans and City Standards that we <br />normally include in our plan sets. <br />We anticipate that, given our current workload, we can prepare the construction plans <br />with sufficient detail for preliminary review within 12 weeks of receiving your approval. <br />The final construction plans would be completed within two-to-three weeks after the <br />geotechnical report, and City comments have been received. <br />The Estimated Total Cost of this contract is $ 124,725 as detailed above. <br />We propose that our Construction Staking Services, if requested, be billed on the <br />basis of actual hours worked multiplied by our Schedule of Normal Hourly Rates and <br />Direct Expenses (enclosed.) <br />Additional services outside the scope of services will be billed on the basis of actual <br />hours worked multiplied by our schedule of normal hourly rates and direct expenses. <br />Terms <br />Special Conditions as listed on page four (4} of this contract apply. If revisions to the <br />above plans detailed above were requested by the owner or by review agencies, those <br />revisions would be made at our standard hourly rates. <br />Thank you for using DHA for this important project. If you have any questions, <br />please call us at (574} 234-4003. If you find the proposal acceptable, please execute this <br />document in the spaces provided below, and return it to us. <br />Sincerely, <br />Danch, Harner & Ass nc. <br />Michael J. Danch - Presid <br />Board of Public Works AQ~roved By & Date <br />Memb r v. <br />CvL_ <br />M tuber <br />Member <br />
The URL can be used to link to this page
Your browser does not support the video tag.