REGULAR MEETING JANUARY 24, 2011 22 <br />Upon a motion made by Mr. Gilot, seconded by Mr. Littrell and carried, the above proposals <br />were referred to Community & Economic Development, the Silver Hawks, and Wightman Petrie <br />for review, tabulation, and recommendation. <br />APPROVE CHANGE ORDER NO. 6 — MIAMI ROAD WIDENING (KERN ROAD TO <br />JACKSON ROAD) — PROJECT NO. 098 -082 (FHWA/LRSA) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 6 on behalf <br />of Hoffinan Bros., Inc., 8574 Verona Road, Battle Creek, Michigan 49014, indicating the <br />Contract amount be increased by $16,870.64 for a new Contract sum, including this Change <br />Order, in the amount of $4,457,677.97. Upon a motion made by Mr. Inks, seconded by Mr. <br />Littrell and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 8 --- TRAFFIC SIGNAL MODERNIZATION — PROJECT <br />NO. 108 -065 (FHWA <br />Mr. Gilot advised that Ms. Thia Vawter, Engineering, has submitted Change Order No. 8 on <br />behalf of Michigaa Contracting, Inc., 7843 Lilac Road, Plymouth, Indiana 46563, indicating the <br />Contract amount be decreased by $23,499.47 for a new Contract sum, including this Change <br />Order, in the amount of $570,256.80. Upon a motion made by Mr. Inks, seconded by Mr. Littrell <br />and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. I (FINAL) AND PROJECT COMPLETION AFFIDAVIT <br />— SOUTHWEST CORNER OF MAIN STREET AND JEFFERSON BOULEVARD SITE <br />RESTORATION (CONCRETE) — PROJECT NO. 110 -072 (SBCDA TIF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 (Final) on <br />behalf of McIntyre Jones, Inc., 2603 North Foundation Drive, South Bend, Indiana 46628, <br />indicating the contract amount be increased by $ 1,301.95 for a new contract sum, including this <br />Change Order, of $38,778.15. Additionally submitted was the Project Completion Affidavit <br />indicating this new final cost of $38,778.15. Upon a motion made by Mr. Inks, seconded by Mr. <br />Littrell and carried, Change Order No. 1 (Final) and the Project Completion Affidavit were <br />approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — CENTURY CENTER HALLS A & B <br />DECORATIVE WALL PANELS — PROJECT NO. 110 -030 (CENTURY_ CENTER BOND) <br />Mr. Gilot advised that Toy Villa, Engineering, has submitted the Project Completion Affidavit <br />on behalf of Brown & Brown General Contractors, Inc., PO Box 487, Wakarusa, Indiana 46573, <br />for the above referenced project,, indicating a final cost of $71,449.20. Upon a motion made by <br />Mr. Inks, seconded by Mr. Littrell and carried, the Project Completion Affidavit was approved: <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS — ONE (1) OR <br />MORE_, PRE -OWNED TACTICAL RESCUE UNIT (2011 FIRE DEPARTMENT CAPITAL) <br />In a memorandum to the Board, Chief Howard Buchanon, requested permission to advertise for <br />the receipt of bids for the above referenced project. Attorney Cheryl Greene stated the Controller <br />questioned whether this is a replacement unit. Mr. Phil Custard, Purchasing, stated he sent an <br />email to the Controller outlining the switching around of several pieces of equipment. He noted <br />the only equipment the Fire Department will be getting rid of is a sixteen foot (16') trailer <br />Therefore, upon a motion made by Mr. Gilot, seconded by Mr. Littrell and carried, the above <br />request was approved. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE <br />SHEET --- PLEASANT STREET SEWER SEPARATION PHASE II - PROJECT NO. 109 -029 <br />ENGINEERING - SEWER PROJECTS <br />In a memorandum to the Board, Mr. John Engstrom, Engineering, requested permission to <br />advertise for the receipt of bids for the above referenced project. Also presented at this time for <br />approval and execution was the Title Sheet. Upon a motion made by Mr. Inks, seconded by Mr. <br />Littrell and carried, the above request to advertise was approved, and the Title Sheet was <br />approved and signed. <br />APPROVAL--OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE <br />BOND — EAST BANK STORM SEWER PHASE 1 A — PROJECT NO. 109 -070 (7010 SEWER <br />In a memorandum to the Board, Mr. Patrick Henthorn, Engineering, requested permission to <br />advertise for the receipt of bids for the above referenced project. Also presented at this time for <br />