My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - KIL Architecture and Planning - Lafayette Building Skylight and Masonry Repairs
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - KIL Architecture and Planning - Lafayette Building Skylight and Masonry Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:35:19 AM
Creation date
6/27/2018 8:35:49 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/26/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
engineering is not expected to be required. <br />e. Bidding: Provide assistance with bidding the project including clarifications to issue for bidders <br />during this phase. <br />f. Construction Administration Phase: Architect to visit site (3 visits included in the proposal). <br />Included in this phase is submittal review, CA phase coordination and correspondence. <br />3. Additional Considerations: <br />a. The building is a candidate for Preservation Tax Credits through 20% HTC through the National <br />Park Services. Architect to offer recommendations that are consistent with Interior Secretary <br />Standards for Rehabilitation that would retain a path to secure HTCs for future development. The <br />Architect will review proposed plans for repair/replacement with local HPC staff, along with State <br />SHPO prior to submitting for pricing. <br />IV, Coordination of Environmental: <br />The City will be contracting separately for the development of bid specifications for abatement and <br />remediation of molds and avian matter, as well removal of wet contents including loose furniture and <br />debris form the building. The Architect will assist the City in coordination of this scope of this work as part <br />of the Project. <br />V. Other Items: <br />1. OWNER PROVIDED ITEMS: <br />a. <br />The Governmental Agency will provide access to the building in order to provide the <br />consultation. <br />2. WORK SCOPE QUALIFICATIONS: <br />a. <br />Site rezoning and/or variances are not included in this proposal. <br />b. <br />Development of civil, mechanical, electrical, environmental design are not included in this <br />proposal. <br />C. <br />ComCheck is not included and a State Plan release is not anticipated. <br />d. <br />Specification of loose equipment and furnishings are not included in this proposal. <br />e. <br />Changes to the scope of the program as requested by the Owner after the preliminary <br />design or construction drawings/specs have begun or completed as outlined above under II <br />and 111, requiring additional time on behalf of the Architect may incur additional fees. <br />f. <br />The preparation of 3-D computer model images of the project (interior and exterior). These <br />can be developed at an hourly rate. <br />g. <br />Changes to the scope of the program requested by the Owner after the Study has begun, <br />requiring additional time on behalf of the Architect. <br />h. <br />Site storm water and sewer design is not included in this proposal. <br />Owner and Engineer further agree as follows: <br />1.01 Basic Agreement and Period of Service <br />A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or if required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner shall pay Engineer for its services as set forth in <br />Paragraphs 7.01 and 7.02. <br />B. Engineer shall complete its services within a reasonable time, or within the following _specific time <br />C. If the Project includes construction -related professional services, then Engineer's time for <br />completion of services is conditioned on the time for Owner and its contractors to complete <br />construction not exceeding 6 months. If the actual time to complete construction exceeds the <br />number of months indicated, then Engineer's period of service and its total compensation shall be <br />appropriately adjusted. <br />Page 3 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright O 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.