My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Beam Longest and Neff LLC - Design of Pedestrian Bridge for Leeper Park Improvement Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Beam Longest and Neff LLC - Design of Pedestrian Bridge for Leeper Park Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:13:13 AM
Creation date
6/27/2018 8:35:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/26/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: E657424D-142C-4DDA-85F9-31 D6971BE411370 <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer for <br />Professional Services dated , <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-l: Basic Services — Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) — Lump Sum Method <br />of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A (Excluding Meetings), except <br />for services of Engineer's Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $24,400,00 based on the following estimated distribution of <br />compensation: <br />a. Study and Report Phase $24,400.00 <br />e. Final Design Phase $ <br />d. Bidding Negate.. Phase $ <br />e. construeFien Phase <br />Qom... <br />2. Engineer may alter the distribution of compensation between individual phases noted herein <br />to be consistent with services actually rendered, but shall not exceed the total Lump Sum <br />amount unless approved in writing by the Owner. <br />The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the <br />billing period. <br />Page 1 <br />Exhibit C —Compensation Packet BC-1: Basic Services (other than RPR) — Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional services. <br />Copyright cC 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.