Laserfiche WebLink
I,fti'� F dx '- <br />BID/PROPOSAL 4 Jv; • s;` <br />CITY OF SOUTH BEN© <br />r <br />Project Name 2018 Curb and Sidewalk Construction <br />Project No. 118-007 <br />For Bids Due June 26th, 2018 at 9:30 am Local Time <br />DIVISION Al <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />807 <br />SY <br />$27.00 <br />$21,789.00 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />818 <br />SY <br />$55.00 <br />$44,990.00 <br />3 <br />CONCRETE CURB, REMOVE <br />1017 <br />LF <br />1$13.50 <br />$13,729.50 <br />4 <br />CONCRETE CURB, MODIFIED <br />1017 <br />LF <br />$30,00 <br />$30,510,00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />102 <br />SY <br />$30.50 <br />$3,111.00 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />79 <br />SY <br />$109.00 <br />$8,611.00 <br />7 <br />TOPSOIL AND SEEDING <br />783 <br />SY <br />$12.19 <br />$9,544.77 <br />10 <br />TREE, REMOVE, 18 IN <br />4 <br />EA <br />$800.00 <br />$3,200.00 <br />11 <br />TREE, REMOVE, 30 IN <br />3 <br />EA <br />$1,200.00 <br />$3,600.00 <br />12 <br />TREE, REMOVE, 481N <br />1 <br />EA <br />$2,100.00 <br />$2,100.00 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2-IN TO 2.5 IN <br />8 <br />EA <br />$650.00 <br />$5,200.00 <br />15 1 <br />CURB RAMP, REMOVE <br />39 <br />SY <br />$61.50 <br />$2,398.50 <br />16 <br />ONE-WAY PERPENDICULAR CURB <br />RAMP <br />26 <br />SY <br />$215.00 <br />$5,590.00 <br />18 <br />PAIRED PERPENDICULAR CURB RAMP <br />23 <br />SY <br />$157.00 <br />$3,611.00 <br />19 <br />REMOVAL, MULBERRY BRUSH, 60-INCH <br />1 <br />EA 1$1,000.00 <br />1$1,000.00 <br />DIVISION Al TOTAL $158,984.77 <br />DIVISION A2 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />150 <br />SY <br />$34.00 <br />$5,100.00 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />150 <br />SY <br />$76.00 <br />$11,400.00 <br />3 <br />CONCRETE CURB, REMOVE <br />158 <br />LF <br />$18.00 <br />$2,844.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />158 <br />LF <br />$52.00 <br />$8,216.00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />34 <br />SY <br />$36.00 <br />$1,224.00 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />34 <br />SY <br />$117.00 <br />$3,978.00 <br />7 <br />TOPSOIL AND SEEDING <br />76 <br />SY <br />$39.88 <br />53,030.88 <br />9 <br />TREE, REMOVE, 10 IN <br />1 <br />EA <br />500.00 <br />$500.00 <br />10 <br />TREE, REMOVE, 18 IN <br />2 <br />EA <br />800.00 <br />1 600.00 <br />11 <br />TREE, REMOVE, 301N <br />1 <br />EA <br />1 200.00 <br />1 200.00 <br />13 <br />STUMP, REMOVE <br />3 <br />EA <br />300.00 <br />$900.00 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2-IN TO 2.5 IN <br />4 <br />EA <br />$650.00 <br />$2,600.00 <br />15 <br />CURB RAMP, REMOVE <br />11 <br />SY <br />$109.00 <br />$1,199.00 <br />18 <br />PAIRED PERPENDICULAR CURB RAMP <br />11 <br />SY <br />$21 1.00 <br />$2,354.00 <br />DIVISION A2 TOTAL $46,145.88 <br />Bidder (Firm): Rieth-Riley - <br />Version 10/17/2017 Contractor's Bid for Public Works - 7 <br />ADDENDUM #1 <br />