Laserfiche WebLink
This is Appendix 2 to EXHIBIT C, consisting of 1 pages, <br />referred to in and part of the Agreement between Owner <br />and Engineer for Professional Services dated , <br />Standard Hourly Rates Schedule <br />A. Standard Hourly Rates: <br />1. ,Standard Hourly Rates are set forth in this Appendix 2 to this Exhibit C and include salaries <br />and wages paid to personnel in each billing class plus the cost of customary and statutory <br />benefits, general and administrative overhead, non -project operating costs, and operating <br />margin or profit. <br />2. The Standard Hourly Rates apply only as specified in Article C2. <br />B. Schedule: <br />Hourly rates for services performed on or after the date of the Agreement are: <br />Senior Project Manager <br />$ 225.00/hour <br />Senior Landscape Architect <br />180.00/hour <br />Project Engineer IV <br />170.00/hour <br />Project Engineer III <br />140.00/hour <br />Project Engineer II <br />105.00/hour <br />Project Engineer I <br />90.00/hour <br />Engineering Designer 11 <br />100.00/hour <br />Page 2 <br />Exhibit C — Appendix 2: Standard Hourly Dates Schedule <br />EdCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright D 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />