My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Lochmueller Group Inc - Leeper Park Improvement Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Lochmueller Group Inc - Leeper Park Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:43:40 AM
Creation date
6/19/2018 2:18:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Compensation for Basic Services not including Resident Project Representative) (as described in Exhibit A, Part 1) <br />Decision Question: Which method of compensation is to be used? <br />Percentage of <br />Direct Labor <br />Direct Labor <br />Lump <br />Standard Hourly <br />Construction <br />Costs Times a <br />Costs Plus <br />Salary Costs <br />Sum <br />Rates <br />Costs <br />Factor <br />Overhead Plus a <br />Times a Factor <br />Fixed Fee <br />Use This Base <br />Compensation <br />packet <br />BC-1 <br />Packet BC-2 <br />Packet BC-3 <br />Packet BC-4 <br />Packet BC-5 <br />Packet BC-6 <br />Packet <br />Include This <br />NIA <br />Appendices 1 and 2 <br />NIA <br />Appendix 1 <br />,Appendix 1 <br />Appendix I <br />Append <br />2, Conpensation for Resident Project Representative (as described in Exhibit A, Paragraph A1.©5.A.2, and in Exhibit D) <br />Decision Question: Which method of compensation is to be used? <br />Lump Sum <br />Standard Hourly <br />Percentage ofDirect <br />Construction <br />Labor Costs <br />Salary Costs Times a <br />Rates <br />Costs <br />Times a Factor <br />Factor <br />Use This RPR <br />Compensation <br />Packet RPR-I <br />Packet RPR-2 <br />Packet RPR-3 <br />Packet RPR-4 <br />Packet RPR-5 <br />Packet <br />Include This <br />NIA <br />Appendices i <br />N/A <br />Appendix 1 <br />Appendix 1 <br />A endix <br />and 2 <br />Page 1 <br />(FabibitC—Compensation Decision Guide) <br />EdCDC E-500 Agreement Between Owner and Engineer far Professional St-iems. <br />Copyright ©1008 National Society ofProfessiaual Engineers for EJCDC. Ail riglns resetved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.