Laserfiche WebLink
:- <br />-SURNTM- <br />w : <br />raMERTMKI <br />- <br />- <br />- <br />rgan <br />w <br />W <br />Services resulting from significant delays, changes, or price increases occurring as a direct <br />or indirect result of materials, equipment, or energy shortages. <br />• <br />iWINi <br />- <br />• i <br />w <br />:MUM <br />w <br />Services (other than Basic Services during the Post -Construction Phase) in connection with <br />any partial utilization of any part of the Work by Owner prior to Substantial Completion. <br />b. Evaluating an unreasonable claim or an excessive number of claims submitted by Contractor <br />or others in connection with the Work. <br />+ <br />- <br />- _ImIffill■ <br />-Y <br />Page 5 <br />(Exhibit A -- Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for E.JCDC. All rights reserved. <br />