My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Danch Harner & Assoc - Design & Repair of Drainage Issues for Old Clay Sewer Easement
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Danch Harner & Assoc - Design & Repair of Drainage Issues for Old Clay Sewer Easement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:19:43 AM
Creation date
6/19/2018 2:10:39 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_00 <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of June 5,2018 ("Effective Date") between <br />Board of Public Works, City of South Bend, Indiana ("Owner") and <br />Danch, Harrier, & Assoc., ineJ,("Engineer"). <br />Owner's Project, of which Engineer's services under this Agreement are a pail, is generally identified as <br />follows: <br />Old Clay Sewer Easement Acquistion Project, Project #1 17-087A("Project"). <br />Engineer's Services under this Agreement are generally identified as follows: <br />Owner and Engineer further agree as follows: <br />1.01 Basic Agreement and Period ofSei-vic,e <br />A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or if required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner, shall pay Engineer for its services as set forth <br />in Paragraphs 7.01 and 7.02. <br />B. Engineer shall complete its services within a reasonable time, or within the following specific time <br />period: 30 days after being provided a notice to begin: <br />C. If the Project includes construction -related professional services, then Engineer's time for <br />completion of services is conditioned on the time for Owner and its contractors to complete <br />construction not exceeding LNA � months, If the actual time to complete construction exceeds the <br />number of months indicated, then Engineer's period of service and its total compensation shall be <br />appropriately adjusted. <br />Page I <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National SocietX.ofProfessioual Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.