Laserfiche WebLink
www.ryodlercorIStrLIction.com <br />Tel: 574.773.3502 Fax* 574.773.4941 <br />June 12, 2018 <br />FT <br />33EZEZ�= <br />LVOI . 1 .0 � ". <br />Project Name., VPA Maintenance Storage Building <br />Project No: VPA Project No. 1062-20181 Public Works Project Nlo. 118-046 <br />For Bids Due: June 12, 2018 <br />Simerlij,4rd 1179 <br />R. Yoder Construction, Inc. would like to propose a voluntary alternate for this project. We <br />propose to supply and erect a stand-alone PEMB (pre-engineered metal building) in lieu of an <br />addition to the existing building. The following are impacts/rational/savings explained <br />1 Largest impact is the lead-time. If this voluntary alternate is accepted, it reduces the lead- <br />time for the building package from 20 weeks to 12 weeks <br />2. To supply and erect the stand-alone structure in this alternate, it would reduce the cost by <br />$9,750.00. However, until the drawings are modified and final building location <br />established, we do not have the cost impact of the other trades (i.e. electrical, concrete, <br />site work, etc). <br />3. The building length would be extended to a typical/standard length of 100'-0" <br />4. The new structure would need to be at least 20' away from the existing building <br />5. The endwall closest to the existing building would be designedi for future expansion to <br />allow the option of filling in between the existing building and the new building. <br />a. The new building; would need to be a maximum of 25' away from the existing <br />building for this scenario to work <br />6. The endwall furthest from the existing building is expandable <br />Jason Yoder, R. Yoder Construction, Inc. <br />ME <br />