My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec R -One or More 2018 or Newer Combination Jet Rodder-Vacuum Machine with Cab and Chassis - Jack Doheny Companies Part 1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Spec R -One or More 2018 or Newer Combination Jet Rodder-Vacuum Machine with Cab and Chassis - Jack Doheny Companies Part 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:46:40 AM
Creation date
6/13/2018 10:29:16 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
below: <br />Introduction to the Equipment and Plant Tour <br />This will include an overview of the complete production <br />process from the arrival of the chassis to completed unit. <br />Viewing this production system will give the employees a <br />better understanding of the finished product. <br />Introduction to Operator's Manual <br />This will include a breakdown of each section of the manual, <br />operational controls, safety shut down, daily and weekly <br />maintenance, and trouble shooting. <br />In-house <br />Upon delivery of the unit to the City of South Bend, the <br />[YES/FO <br />Training: <br />successful bidder will provide a factory authorized trainer to <br />do on -street training for the operators. <br />This training will include a review of daily and weekly <br />maintenance and proper operations of this equipment. <br />Training will continue as long as the City of South Bend <br />deems necessary. The successful bidder will be responsible <br />for the cost of training the first five (5) days and the City will <br />pay a reasonable hourly rate for any additional training past <br />that time. Lodging and meals for the trainer are the <br />responsibility of the bidder. <br />Continued <br />Additional information and answers to questions from the <br />rYE'SNO <br />Training: <br />City shall be provided by the manufacturer for the life of the <br />*mmmmmp <br />machine at no cost to the City of South Bend. <br />Inspection and <br />The successful bidder shall arrange a final inspection of the <br />rY-E-S-*O <br />Delivery: <br />combination jet rodder/vacuum machine upon delivery with <br />'mmm"' <br />the manager of the City Equipment Services Division. If it is <br />found that the equipment does not conform to the <br />specifications as written, the City reserves the right not to <br />accept the unit until such time as all corrections have been <br />made by the bidder to meet the specifications. <br />Criteria for <br />The award of a contract pursuant to this specification, if any <br />r—yE-s7kqo <br />Award: <br />be made, will be made within thirty (30) calendar days after <br />the opening of the proposals to the lowest responsible and <br />responsive bidder whose proposal complies with all of the <br />requirements prescribed. Until the final award to the <br />contract, however, the right is reserved by the City to reject <br />any and all proposals and to waive technical errors. <br />Ver. 2 - March 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.