Laserfiche WebLink
12 volt system with plug in at the operators station. <br />Maintenance: <br />All bearings, bushings, pivot points and boom to be greased <br />0 <br />by the operator from ground level. <br />Mounting: <br />Unit bid will be mounted on an approved truck chassis at the I <br />YLE§)NO, <br />factory of the body manufacturer. Shall include a tool box as <br />specified by the City, located behind the cab, 48" long x, 22" <br />deep, 10" tall, with a 24"' long x 22" deep 10" tall box on top. <br />Both shall have fold down doors. <br />Parts & <br />Due to the type of work this equipment will perform, down (Y��O <br />Service: <br />time must be kept to a minimum. Accordingly, parts and <br />servi�ce must be available as listed below: <br />Parts must be shipped within 48 hours of notification <br />(excluding weekends and h�olidays) or they are not charged <br />to the City. <br />Service and repair at the City's facilities from the <br />manufacturer must be available within twenty-four (24) <br />hours of notification to the manufacturer, excluding <br />weekends and holiday. <br />Factory authorized service location with stock parts must be <br />provided by the manufacturer. <br />Two copies each of operational, parts and repair manuals <br />shall be provided. Any available technical date sheets shall <br />also be provided, and two sets of line tickets shall be <br />furnished on the truck. <br />Safety: <br />Operator station dB level not to exceed 90 dB, Unit to <br />0 <br />include safety cone holder. <br />Warranties: <br />The equipment furnished pursuant to these specifications <br />YE§J'm <br />shall be warranted by the manufacturer as follow: <br />All equipment supplied by the bidder, whether or not <br />manufactured by the bidder, will be warranted by the bidder <br />for a minimum of one (1) year from the date of acceptance <br />after delivery. <br />The positive displacement blower shall be warranted for a <br />period of five (5,) years. <br />Ver. 2 — March 2018 <br />