Laserfiche WebLink
Prepared for: <br />Bern Blazo�sky <br />GapVax <br />575 Central Avenue <br />Johnstown, PA 15902 <br />Phone: 814-535-6766 <br />Description <br />HENDRICKSON RT/RTE - 7.19" SADDLE <br />STANDARD AXLE SEATS IN AXLE CLAMP <br />GROUP <br />54 INCH AXLE SPACING <br />STEEL BEAMS AND RUBBER CENTER <br />BUSHINGS WITH BAR PIN ADJUSTABLE END <br />CONNECTIONS <br />FOREIAFT AND TRANSVERSE CONTROL RODS <br />Brake System <br />WABCO 4S/4M ABS WITH TRACTION CONTROL <br />REINFORCED NYLON, FABRIC BRAID AND WIRE <br />BRAID CHASSIS, AIR LINES <br />FIBER BRAID PARKING BRAKE HOSE <br />STANDARD BRAKE SYSTEM VALVES <br />RELAY VALVE WITH 5-8 PSI CRACK PRESSURE, <br />NO REAR PROPORTIONING VALVE <br />BW AD-9 BRAKE LINE AIR DRYER WITH HEATER <br />BENDIX OIL COALESCING FILTER FOR AIR <br />DRYER <br />AIR DRYER MOUNTED OUTBOARD ON LH RAIL <br />STEEL AIR BRAKE RESERVOIIRS; CUSTOMER <br />ACCEPTS TANKS MOUNTED PERPENDICULAR <br />TO RAIL <br />PULL CABLES ON ALL AIR RESERVOIR(S) <br />Wheelbase & Frame <br />6650MM (262 INCH) WHEELBASE <br />7/16X3-9/16Xl 1, -118 INCH STEEL FRAME <br />(11.1 1MMX282.6MM10.437X1 11.13 INCH) 120KSI <br />1/4 INCH (6.36MM) C-CHANNEL INNER FRAME <br />REI NFORCEIMENT WITH SEALANT FOR DOUBLE <br />CHANNEL RAILS <br />2550MMi (100 INCH) REAR FRAME OVERHANG <br />FRAME OVERHANG RANGE:91 INCH TO 100 <br />INCH <br />24 INCH INTEGRAL FRONT FRAME EXTENSION <br />WITH 0.25 INCH INSERT <br />CALC'D, BACK OF CAB TO REAR SUSP C/L (CA): <br />180.78 in <br />CALCULATED EFFECTIVE BACK OF CAB TO <br />REAR SUSPENSION C/L (CA) � 177.78 in <br />CALC'D FRAME LENGTH - OVERALL � 413.69 <br />CALC'D SPACE AVAILABLE FOR DECKPLATE: <br />180.78 in <br />Application Version 9.3.109 <br />Data Version PRL-16T.01 0 <br />GapVax Stock MC 370, hp, <br />WESTERN STAR' <br />Prepared by: <br />Mike Ringler <br />RINGLER MOTORS, INC, <br />1555 FERNDALE AVE. <br />JOHNSTOWN, PA 15905 <br />Phone: <br />Mobile: <br />02107/2018 1:28 PM <br />Pa�ge 8 of 16 <br />