Conctractor"s Bid for Public Work - City of South Bend
<br />Project No. 117-057A
<br />PROJECT NAME Ameritech Drive Pavement Improvements
<br />PROJECT NUMBER 117-057A.
<br />FOR BIDS DUE June 112 2018
<br />Base Bid
<br />May 2018
<br />Item No.
<br />Description
<br />Quantity
<br />Unit.
<br />Unit (Price
<br />Total Amount
<br />1.
<br />Construction Engineering
<br />1
<br />LS
<br />$ 3,700.00
<br />$ 3,700.00
<br />2.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />$ 18,500.00
<br />$ 18,500.00
<br />3.
<br />Clearing Right of Way
<br />1
<br />LS
<br />$ 8,4%00
<br />$ 8,450.00
<br />4.
<br />Sheet Sign, Remove and Relocate
<br />3
<br />EACH
<br />$ 400.00
<br />$ 1,200.00
<br />5.
<br />Fire Hydrant Assembly, Remove and Relocate
<br />1
<br />EACH
<br />$ 5,200.00
<br />$ 5,200.00
<br />6.
<br />Concrete Curb and Gutter, Remove
<br />820
<br />LFT
<br />$ 5.30
<br />$ 4,346.00
<br />7.
<br />Concrete Approaches, Remove
<br />240
<br />SYD
<br />$ 11.00
<br />$ 2,640.00
<br />8.
<br />Common Excavation
<br />2,370
<br />CYD
<br />$ 24.00
<br />$ 56,880.00
<br />9.
<br />"B" Borrow
<br />1,490
<br />CYD
<br />$ 30.80
<br />$ 45,892.00
<br />10.
<br />Milling, Asphalt, Variable Depth
<br />4,0160
<br />SYD
<br />$ 3.00
<br />$ 12,180.00
<br />111.
<br />HMA for Patching (Undistributed)
<br />340 .
<br />TON
<br />$ 58.00
<br />$ 19,720.00
<br />12.
<br />Compacted Aggregate for Base, No. 53
<br />630
<br />TON
<br />$ 40.00
<br />$ 25,200.00
<br />13.
<br />HMA Surface, 9.5 mm, Type B
<br />480
<br />TON
<br />$ 82,00
<br />$ 39,360.00
<br />14.
<br />HMA Intermediate, 19.0 mm, Type B
<br />170
<br />TON
<br />$ 78.00
<br />$ 13,260.00
<br />15.
<br />HMA Base, 25.0 mm, Type B
<br />670
<br />TON
<br />$ 58.00
<br />$ 38,860.00
<br />16.
<br />Concrete Curb and Gutter, 6"
<br />820
<br />LFT
<br />$ 29,00
<br />$ 23,780.00
<br />17.
<br />PCCP for Approaches„ 6"
<br />60
<br />SYD
<br />$ 72.00
<br />$ 4,320.00
<br />18.
<br />PCCP for Approaches, 9"
<br />320
<br />SYD
<br />$ 79,50
<br />$ 25,440.00
<br />19.
<br />Mulched Seeding, Type U
<br />860
<br />SYD
<br />$ 6,67
<br />$ 5,736.20
<br />20.
<br />Maintaining Traffic
<br />1
<br />LS
<br />$ 15,474.80
<br />$ 15,474.80
<br />21.
<br />Line, Thermoplastic, Yellow, 4"
<br />518
<br />LFT
<br />$ 2,00
<br />$ 1,036.00
<br />22.
<br />Line, Thermoplastic, White, 4",
<br />230
<br />LFT
<br />$ 2.00
<br />$ 460.00
<br />23.
<br />Transverse Line, Thermoplastic, White, 24", Stop Bar
<br />40
<br />LFT
<br />$ 10,00
<br />$ 400.00
<br />24.
<br />Pavement Message Marking, Thermoplastic, Lane Indication
<br />2
<br />EACH
<br />$ 250.00
<br />$ 500.010
<br />Arrow
<br />25.
<br />HMA for Temporary Pavement
<br />445
<br />SYD
<br />$ 37.00
<br />$ 16,465.00
<br />Total Amount of (Base Bid! (items 1 through 25) 1 $389,000,001
<br />
|