Contractor's Bid for Public Work - City of South Bend
<br />Project No. 117-057A
<br />BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Addendum No. 1
<br />May 2018
<br />PROJECT NAME Ameritech Drive Pavement Improvements
<br />PROJECT NUMBER 117-057A
<br />FOR BIDS DUE June 12 2018
<br />Base
<br />Bid
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1.
<br />Construction Engineering
<br />1
<br />LS
<br />$ 4,000.00
<br />$ 4,000.00
<br />2.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />$ 3,000,00
<br />$ 3,000.00
<br />3.
<br />Clearing Right of Way
<br />1
<br />LS
<br />$ 7,500.00
<br />$ 7,500.00
<br />4.
<br />Sheet Sign, Remove and Relocate
<br />3
<br />EACH
<br />$ 300.00
<br />$ 900.00
<br />5.
<br />Fire Hydrant Assembly, Remove and Relocate
<br />1
<br />EACH
<br />$ 2,300.00
<br />$ 2,300.00
<br />6.
<br />Concrete Curb and Gutter, Remove
<br />820
<br />LIFT
<br />$ 14.00
<br />$ 11,480.00
<br />7.
<br />Concrete Approaches, Remove
<br />240
<br />SYD
<br />$ 37.00
<br />$ 8,880,00
<br />8.
<br />Common Excavation
<br />2,370
<br />CYD
<br />$ 28.00
<br />$ 66,360.00
<br />9.
<br />"B" Borrow
<br />1,490
<br />CYD
<br />$ 34.00
<br />$ 50,660,00
<br />10.
<br />Milling, Asphalt, Variable Depth
<br />4,060
<br />SYD
<br />$ 3.50
<br />$ 14,210.00
<br />11.
<br />HMA for Patching (Undistributed)
<br />340
<br />TON
<br />$ 135.00
<br />$ 45,900,00
<br />12.
<br />Compacted Aggregate for Base, No. 53
<br />630
<br />TON
<br />$ 33.00
<br />$ 20,790.00
<br />13.
<br />HMA Surface, 9.5 mm, Type B
<br />480
<br />TON
<br />$ 97.00
<br />$ 46,560.00
<br />14.
<br />HMA Intermediate, 19.0 mm, Type B
<br />170
<br />TON
<br />$ 130.00
<br />$ 22,100,00
<br />15,
<br />HMA Base, 25.0 mm, Type B
<br />670
<br />TON
<br />$ 84.00
<br />$ 56,280.00
<br />16.
<br />Concrete Curb and Gutter, 6"
<br />820
<br />LFT
<br />$ 27.00
<br />$ 22,140,00
<br />17,
<br />PCCP for Approaches, 6"
<br />60
<br />SYD
<br />$ 65.00
<br />$ 3,900.00
<br />18.
<br />PCCP for Approaches, 9"
<br />320
<br />SYD
<br />$ 63.00
<br />$ 20,160,00
<br />19.
<br />Mulched Seeding, Type U
<br />860
<br />SYD
<br />$ 6.28
<br />$ 5,400.80
<br />20.
<br />Maintaining Traffic
<br />1
<br />LS
<br />$ 8,000.00
<br />$ 8,000.00
<br />21.
<br />Line, Thermoplastic, Yellow, 4"
<br />518
<br />LIFT
<br />$ 1.45
<br />$ 751.10
<br />22.
<br />Line, Thermoplastic, White, 4"
<br />230
<br />LIFT
<br />$ 1.45
<br />$ 333.50
<br />23.
<br />Transverse Line, Thermoplastic, White, 24", Stop Bar
<br />40
<br />LIFT
<br />$ 5.95
<br />$ 238.00
<br />24
<br />Pavement Message Marking, Thermoplastic, Lane Indication
<br />Arrow
<br />2
<br />EACH
<br />$ 80.00
<br />$ 160.00
<br />25.
<br />HMA for Temporary Pavement
<br />445
<br />SYD
<br />$ 34.00
<br />$ 15,130.00
<br />Total Amount of Base Bid (items 1 through 25)
<br />$437,133.40
<br />Bidder's Name: Rieth-Riley
<br />Version 10/17/2016 Contractor's Bid For Public Works-7
<br />
|