9. Clarifications and Interpretations; Field Orders: Issue necessary clarifications and <br />interpretations of the Contract Documents as appropriate to the orderly completion of <br />Contractor's work. Such clarifications and interpretations will be consistent with the intent <br />of and reasonably inferable fiom the Contract Documents. Subject to any limitations in the <br />Contract Documents, Engineer may issue field orders authorizing minor variations in the <br />Work from the requirements of the Contract Documents. <br />10. Change Orders and Work Change Directives: Recommend change orders and work change <br />directives to Owner, as appropriate, and prepare change orders and work change directives <br />as required. <br />11. Shop Drawings and Samples: Review and approve or take other appropriate action in <br />respect to Shop Drawings and Samples and other data which Contractor is required to <br />submit, but only for conformance with the information given in the Contract Documents <br />and compatibility with the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. Such reviews and approvals or other action will <br />not extend to means, methods, techniques, sequences, or procedures of construction or to <br />safety precautions and programs incident thereto. Engineer shall meet any Contractor's <br />submittal schedule that Engineer has accepted. <br />12. Substitutes and "or -equal": Evaluate and determine the acceptability of substitute or "or - <br />equal" materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />13. Inspections and Tests: Require such special inspections or tests of Contractor's work as <br />deemed reasonably necessary, and receive and review all certificates of inspections, tests, <br />and approvals required by Laws and Regulations or the Contract Documents. Engineer's <br />review of such certificates will be for the purpose of determining that the results certified <br />indicate compliance with the Contract Documents and will not constitute an independent <br />evaluation that the content or procedures of such inspections, tests, or approvals comply <br />with the requirements of the Contract Documents. Engineer shall be entitled to rely on the <br />results of such tests. <br />14. Disagreements between Owner and Contractor: Render formal written decisions on all <br />duly submitted issues relating to the acceptability of Contractor's work or the interpretation <br />of the requirements of the Contract Documents pertaining to the execution, performance, or <br />progress of Contractor's Work; review each duly submitted Claim by Owner or Contractor, <br />and in writing either deny such Claim in whole or in part, approve such Claim, or decline to <br />resolve such Claim if Engineer in its discretion concludes that to do so would be <br />inappropriate. In rendering such decisions, Engineer shall be fair and not show partiality to <br />Owner or Contractor and shall not be liable in connection with any decision rendered in <br />good faith in such capacity. <br />15. Applications for Payment: Based on Engineer's observations as an experienced and <br />qualified design professional and on review of Applications for Payment and accompanying <br />supporting documentation: <br />Page 7 <br />(Exhibit A -- Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National society of Professional Engineers for EJCDC. All rights reserved. <br />