My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Safe Routes to School Monroe Primary and Studebaker Elementary Proj No 116-039 - INDOT - DLZ Indiana
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 1 - Safe Routes to School Monroe Primary and Studebaker Elementary Proj No 116-039 - INDOT - DLZ Indiana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:40:37 PM
Creation date
5/23/2018 3:03:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract NOR -39513 INDIANA Date:0510312018 <br />Change Order No:001 Department Of Transportation Page: 3 <br />Contract: R -39513 <br />Project: 1600075 - State:160007500L.C4 <br />Change Order Mr. 001 <br />Change Order Description: Adding Sorrow and Concrete Patching <br />Reason Code: CHANGED COND, Constructability Related <br />CLN PCN PLN Item Cade unit Unit Price CO City Comment Amount Change <br />0020 1608075 0021 207-08264 SYS 40,250-818.000 C Amount:$ 32,924.50 <br />Item Description: SUBGRADE TREATMENT. TYPE It <br />Supplemental Descriptioni: <br />Supplemental Dascriptlon2: <br />0021 1600075 0022 304-07490 TON <br />Item Description: HMA PATCHING, TYPE t3 <br />Supplemental Descriptions: <br />Supplemental Descdiolion2: <br />0039 1600075 0038 203-02070 CYS <br />Item Description: BORROW <br />Supplemental Descriptionl: <br />Supplemental Desariptlon2: <br />0040 1600075 0039 506-0fi333 SYS <br />item Description: PCCP PATCHING FULL DEPTH <br />Supplemental Descaiptioni: <br />Supplemental Description2: <br />290.000-455.000 <br />55.000 400.000 <br />100.250 1300.000 <br />C <br />C <br />C <br />Amount:$ -131,950.00 <br />Amount:$ 22,000,00 <br />Amount:$ 1$0,325.00 <br />Total Value for Change Order 001 = $-12,649.60 <br />Whereas, the Standard Speclficationa for this contract provides for such work to be performed, the following change Is recommended, <br />General or Standard Change Order Explanation <br />This change order creates a borrow item which is needed to fill the voids under the new sidewalk after the large roots have been removed in the <br />areas where the trees were taken down. A concrete patching Item has also been created which will replace the Base portion of the HMA Patching <br />Item as well as the Subgrade Treatment at these patching locations located at the comer curb ramps. The concrete patching which was approved <br />by the City of South Bend will fill these patches up to 1.5 in. below grade leaving only the HMA Surface to finish the patch. The concrete can be <br />placed the next day as opposed to waiting weeks for the HMA Base eliminating a safety hazard at these Intersecfions. There is also a cost <br />savings to the project. No additional time is needed for this change order. <br />Change Order Explanation for Specific Lino Item <br />fffHf+f t+f Kf#+lifK M+K.A++fi#i#fHf+fKiHfffHfHKHf ifsH,ifiK+i+#HK#iHKr+KK4,iMH.if#++#fH#++f++Hff#H#f## <br />It is the Intent of the parties that this change order is full and complete compensation forthe work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor. Sr. 1 A 0— C o t1.5t' C :rA 4 . Signed By: �^'ty`t�� _.L.L.A <br />Bate: 3 , <br />#+ff+HiiHi+-f#fHff+#f f+f tit.++•+� f+f #+#++K####+#KaKif i+ik#,K+K#Kw##Kffffafff f sill.HaK+f+.Kiara+.�+..+K.a+x+rfi <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system, <br />
The URL can be used to link to this page
Your browser does not support the video tag.