My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Vietnam Veterans Memorial Relocation Proj No 117-047A - Slatile Roofing and Sheet Metal Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Award Bids
>
Award Bid - Vietnam Veterans Memorial Relocation Proj No 117-047A - Slatile Roofing and Sheet Metal Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 11:56:30 AM
Creation date
5/23/2018 2:59:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOARD OF PUBLIC WORDS <br />CITY OF SOUTH BEND, INDIANA <br />PUBLIC WORKS CONTRACT <br />THIS AGREEMENT, made and entered into this 22nd day of May, 2018, by and between, Slatile <br />Roofing and Sheet Metal Co., Inc., 1703 South Ironwood Dr., South Bend, IN 46613, <br />HEREINAFTER called the "Contractor", and the Board of Public Works herein called the <br />"Board". <br />WITNESSETH: That the Contractor covenants and agrees to make the following improvement, <br />as fully set out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid <br />Proposal, all of which are set forth as a part of this Contract, for: <br />PROJECT NO.: 117-047A <br />DESCRIPTION: VIETNAM VETERANS MEMORIAL RELOCATION <br />COMPLETION DATE: SEE SPECIFICATIONS <br />AMOUNT: $152,850; BASE BID ONLY <br />FUNDING: REGIONAL CITIES GRANT <br />The total bid for this improvement were those prices as received and accepted by the Board on the <br />May 22,2018. <br />The Contractor farther agrees to notify the Engineer when this improvement is completed. This <br />notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final <br />acceptance of the improvement by the Engineer, the Contractors final estimate will be presented <br />to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of <br />a Waiver of Lien. <br />BOARD OF PUBLIC WORKS <br />d 4." - <br />UAI <br />Gary A. Gilot, President Elizabeth k Maradik, Member <br />Suzanna M. Fritzberg, <br />Member A <br />A. Mueller, Member <br />J. l5orau, Member ',,_/Attest: Linda" M. � Martin, <br />Clerk <br />SLATILE ROOFING AND SHEET <br />METAL CO., INC. <br />Printed Name <br />Signature <br />CERTIFICATION (To be completed if Contractor is a Corporation) <br />certify that I am Secretary of the Corporation named as <br />Contractor herein; that who signed this Agreement on behalf of the Contractor <br />was then of said Corporation; that said agreement was duly signed for and in <br />behalf of said Corporation by authority of its governing body, and is within the scope of its <br />corporate powers. <br />Secretary Corporate Seal <br />
The URL can be used to link to this page
Your browser does not support the video tag.