My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Lawson Fisher Assoc. - West Bank Trail Corridor Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Lawson Fisher Assoc. - West Bank Trail Corridor Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:39:53 AM
Creation date
5/9/2018 1:26:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/8/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L At completion of any geotechnical or material investigation services and upon payment of monies <br />due the Engineer for those services, the Engineer shall provide the owner with all data, upon which <br />it will become the property of the Owner. <br />6.04 Insurance <br />A. Engineer shall procure and maintain insurance as set forth in Exhibit G, "Insurance." Engineer shall <br />cause Owner to be listed as an additional insured on any applicable general liability insurance policy <br />carried by Engineer. <br />• <br />.. <br />-- .• <br />i -- <br />Y <br />t <br />1 <br />D. Ownef an Engineer shall eac4deliver to the Owner at4evicertificates of insurance evidencing the <br />coverages indicated in Exhibit G. Such certificates shall be furnished prior to commencement of <br />Engineer's services and at renewals thereafter during the life of the Agreement. <br />� <br />W <br />W <br />• <br />. <br />F. All policies of insurance shall contain a provision or endorsement that the coverage afforded will <br />not be canceled or reduced in limits by endorsement, and that renewal will not be refused, until at <br />least 30 days prior written notice has been given to Owner and Engineer -and to each other additional <br />insured (if any) to which a certificate of insurance has been issued. <br />G. At any time, Owner may request that Engineer or its Consultants, at Owner's sole expense, provide <br />additional insurance coverage, increased limits, or revised deductibles that are more protective than <br />those specified in Exhibit G. If so requested by Owner, and if commercially available, Engineer <br />shall obtain and shall require its Consultants to obtain such additional insurance coverage, different <br />limits, or revised deductibles for such periods of time as requested by Owner, and Exhibit G will be <br />supplemented to incorporate these requirements. <br />6.05 Suspension and Termination <br />A. Suspension: <br />By Owner: Owner may suspend the Project for up to 90 days upon seven days written notice <br />to Engineer. <br />Page 7 <br />EdCDC E-500 Agreement Between owner and Engineer for Professional services <br />Copyright © 2008 National Society of Professional Engineers for E.JCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.