My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - EPOCH Architecture + Planning - VPA Restroom Remodel
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - EPOCH Architecture + Planning - VPA Restroom Remodel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:24:59 AM
Creation date
5/9/2018 1:21:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/8/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D. The number of prime contracts for Work designed or specified by Engineer upon which the <br />Engineer's compensation has been established under this Agreement is 1. If more prime contracts <br />are awarded, Engineer shall be entitled to an equitable increase in its compensation under this <br />Agreement. <br />A 1.04 Bidding or Negotiating Phase <br />A. After acceptance by Owner of the bidding documents and the most recent opinion of probable <br />Construction Cost as determined in the Final Design Phase, and upon written authorization by <br />Owner to proceed, Engineer shall: <br />1. Assist Owner in advertising for and obtaining bids or proposals for the Work and, where <br />applicable, maintain a record of prospective bidders to whom Bidding Documents have <br />been issued, attend pre -bid conferences, if any, and receive and process contractor deposits <br />or charges for the bidding documents. <br />2. Issue addenda as appropriate to clarify, correct, or change the bidding documents. <br />3. Provide information or assistance needed by Owner in the course of any negotiations with <br />prospective contractors. <br />4. Consult with Owner as to the acceptability of subcontractors, suppliers, and other <br />individuals and entities proposed by prospective contractors for those portions of the Work <br />as to which such acceptability is required by the bidding documents. <br />5. If bidding documents require, the Engineer shall evaluate and determine the acceptability of <br />"or equals" and substitute materials and equipment proposed by bidders, but subject to the <br />provisions of paragraph A2.02.A.2 of this Exhibit A. <br />6. Attend the Bid opening, prepare Bid tabulation sheets, and assist Owner in evaluating Bids <br />or proposals and in assembling and awarding contracts for the Worst. <br />7. Peffe" er provide the f6howing additiatial Bidding at! Negotiating Phase tasks -6& <br />B. The Bidding or Negotiating Phase will be considered complete upon commencement of the <br />Construction Phase or upon cessation of negotiations with prospective contractors (except as may <br />be required if Exhibit F is a part of this Agreement). <br />A1.05 Construction Phase <br />A. Upon successful completion of the Bidding and Negotiating Phase, and upon written authorization <br />from Owner, Engineer shall: <br />General Administration of Construction Contract: Consult with Owner and act as Owner's <br />representative as provided in the Construction Contract. The extent and limitations of the <br />duties, responsibilities, and authority of Engineer as assigned in the Construction Contract <br />shall not be modified, except as Engineer may otherwise agree in writing. All of Owner's <br />Page 4 <br />(Exhibit A -- Engineer's Services) <br />EJCDC E-500 ,Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.