My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - EPOCH Architecture + Planning - VPA Restroom Remodel
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - EPOCH Architecture + Planning - VPA Restroom Remodel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:24:59 AM
Creation date
5/9/2018 1:21:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/8/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8. Revise the Report and any other deliverables in response to Owner's comments, as <br />appropriate, and furnish 3 copies of the revised Report and any other deliverables to the <br />Owner within 7 calendar days of receipt of Owner's comments. <br />B. Engineer's services under the Study and Report Phase will be considered complete on the date <br />when the revised Report and any other deliverables have been delivered to Owner. <br />A 1.02 Preliminmy Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, <br />extent, character, or design requirements of the Project desired by Owner, and upon written <br />authorization from Owner, Engineer shall; <br />1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and written descriptions of the Project. (Up to one <br />meetings are included within this phase.) <br />2. Provide necessary field surveys and tepagFap and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners. <br />3. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />b. Furnish 3 review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within 14 calendar days of authorization to proceed with this phase, <br />and review them with Owner. Within 14 calendar days of receipt, Owner shall submit to <br />Engineer any comments regarding the Preliminary Design Phase documents and any other <br />deliverables. <br />• <br />B. Engineer's services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />Page 2 <br />(Exhibit A — Engineer's Seiviecs) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright (0 2003 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.