My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/17/1913 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1913
>
09/17/1913 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:52:48 PM
Creation date
5/8/2018 10:28:34 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/17/1913
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
142 <br />Wednesday September 17th.. 1913. <br />Board met in regular sessiox at 10:00 A.M. All members present. <br />J ` <br />Bids were ordered re -advertised for Grade on lst. alley North of Madison Street <br />from St. Louis Street to St: Peter Street, under Improvement Resolution No. 288 <br />To be advertised September 17th.,1913 and September 24th.11913 in the South Benda <br />Daily News -Times, stating that this Board will receive bids for the said improve- <br />ment on the 30th., day of September,1913 at 10. 00 A.M. <br />Communication re ceived. feom Mr. C.H.Defrees regarding pavii,g material on Dunham <br />Street. The same was read. and placed on file. As follows: <br />To the Board of Public Works., <br />of the City of South Bend, <br />Gentlemen: - <br />In regard to the Dunham St. paveme_t awarded for Barr Clay Block, it y <br />will be impossible for me'to get the Barr Clay Block and finish the street in t4- <br />specified time. <br />I will ask - of your honorable body to change the block to the Wabash. <br />Clay $lock so I can complete the street in the specified time. <br />t, <br />Yours very respectively submitted., <br />C.H. DEFREES. <br />JIn the matter of the pavement of Dunham Street Brick Pavement, C. H. <br />Defrees the contractor for said pavement represented that it would be impossible for <br />him to get Barr Clay Block Brick to complete the said contract in the time specified <br />or even in the fall of 1913, but he could complete the same within the specified <br />time if allowed to use Wabash Clay Block. <br />The Exgineer reported that the quality of� Wabash: Brick is fully equal <br />to the said .Barr Clay Block, and the street if paved with Wabash Clay Block, will <br />be in every possible respect as good as if paved with Barr Clay Block. <br />Now Therefore, Be It Resolved by the Board cif Public Works that the <br />contract with said. C. H.Defrees for the pavement of Dunham Street between Arrold <br />Street and Harris Street be modified to allow the pavement of said Street with <br />Wabash Clay Block ixstead of Barr Clay Block <br />BOARD OF PUBLIC WORKS. <br />e <br />President. <br />
The URL can be used to link to this page
Your browser does not support the video tag.