My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/01/1913 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1913
>
07/01/1913 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:44:15 PM
Creation date
5/3/2018 1:44:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/1/1913
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br />-Board met in regular session at 10:00 A.M. All members present. <br />J Bids w re received for Grade and Paving with Gravel on ifichigan Avenue from Olive Street <br />to 1436 ft. vrest, under Improverien.t Resolutsori No. 205• In the City of South Bend, Indiana.. <br />The sa.re. were open.ded and referred to the City Engineer for tabulation. <br />✓ Partial- estimate for grade, curb gnd walk on Johnson. Street from Vassar Avenue to the <br />north line of Mayrts Mich. Ave. Addition., allowed to H.N. Barnes,Centraetor,amoun.t..$1,066.62 <br />,/Partial estimate for grade, curb and walk And Conerete Pavement on Prairie Avenue from <br />Webster Street to Grant Street, under Improvement Resolution No. 291 allowed to C. H. <br />Defrees, Co tractor. for the amount ef...•..................... ................ 2,047.50 <br />/V*.forred hearing given on Assessment roll and final estimate for Pipe sewer on Euclid <br />Avenue from Brick Avenue to a point 50 ft. No. of the North line of LaPorte Avenue,under <br />Improvement Re -solution No. 212. I-n the City of South Bend, Indiana. <br />In the above matter • no romenstrators appeared and no further remonstrance <br />eras filed. The Board therefore dind that. the propertyassessed in said roll filed <br />May 20th.,1913 is benefited in the amount of assessments as shown on said rolls, and the <br />Board further find that the, assessment roll filed May 20th.21913 and the final estimate alley <br />May 20th. ,1913 shoulal be and the same are hereby in all things ratified, confirmed and <br />approved. <br />✓Petit•ion filed with the Board for grade, curb and walk on Tenth Street from ®Pall Street <br />to G.T..Ry. Co.'`s right of way. The same was read and referred to the City Engineer for <br />investigation. <br />✓ Permission —was granted. -the Indiana & Michigan Elea. Company to set poles and anchors as <br />follows. <br />To reset one guy stub and anchor in the first alley east of Taylor Street,about <br />70 ft. south of Division. Street an the west side of the alley. This is to make room for <br />a ga,rige Mr. Walters is to put up. Approved. , <br />To move a puy stub from a point about 951 south of Fuerbringer St. on Sherman Ave. -to a <br />point about 1191 south of Fuerbrin.ger on Sherman, se as to bring the stub on the property <br />line. This request has been made to us by the property owner. <br />Also to set one 351 pole in the first alley merest of Portage Ave., <br />about 1001 north of Kenyon Street for tiie accommodation of a lighting connection. approved. <br />Engineer filed assessment roll and final estimate for pipe sevver on Quincy Street from Porta, <br />Avenue to Blaine Avenue ,under Improvement Resolution. No. 222.Int the City of South Bond, <br />Indiana. <br />R solved, that notie as to the amounts of assessments be published On <br />Saturday July `f .,1913 and. on JJJ , deny of July 4913 in the South Bend Daily Nuys —Times <br />Stating that tlL�s Board will give L hearing on the amount of such assessments at its office <br />in the City Hall on the 25th., day of July,1913. at 7:45 P.M. <br />Resolved further, tnaa the entire work under the above contracts be <br />accepted and approved and the final estimate thereon allowed. Notice of the resolution <br />s13all be .published en the 5th.2 day of July21913 and on the 12th., day of July21913 <br />in the South Bend Daily News —Times, stating that this Beard will give a hearing on the <br />Rcceptance of such work at its office in the City Hall on the 25th., day of July,1913 <br />et 7:45 P.M. <br />Petition roe*ive`d from resident property on Niles Avemue,in regard to letting the contract <br />for improve ent of Niles Avenue from Howard Street to Napoleon Street by ccinstructien <br />of Grade, curb and walk, to not eonsid.er bids from T.C.Barnes or Harry Barnes, the same <br />was referred to the City Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.