Laserfiche WebLink
Board met in regular session at 9:00 A.M. All members present.' <br />Bids were received opened and read as follows. <br />Pavement on Indiana Avenue from Olive Street to Prairie Avenge. <br />Bich of Reith Riley Constr, Co, <br />, <br />Walk per sq. ft..20 <br />Curb : per lin ft,, <br />.60 <br />Grading per cu. yd. <br />.90 <br />Sheet, asphalt trinidad <br />3,1fl <br />Sheet asphalt Mexican <br />2.90 <br />Asphaltic conorete Trinidad <br />2.80 <br />Asphaltic concrete Mexican <br />2.60 <br />7 inch' conorete pavement -per sq. yd. <br />2.37 <br />8 inch conduit pipe per lin ft. <br />1.00 <br />Storm wat.,r inlets complete <br />15.00 <br />- - -- Marginal curb per lin ft. <br />.40 <br />Resetting inlets, each <br />3.00 <br />Resetting manhole civets, each <br />3.00 <br />Bid of White Construction Company* <br />Walk per sq. ft. <br />.2® <br />Curb per lin ft. <br />.45 <br />Grading per cti. yd. <br />•90 <br />Sheet asphalt using Trinidad Lake per sq. yd. <br />2.q0 <br />Sheet asphalt using Mexican per sq. yd. <br />2.70 <br />Asph. Con. using Trinidad Lake per sq. yd. <br />2.65 <br />Asph. Con. using Mexican 9,sphalt per s- . yd. <br />2.45 <br />8 inch conduit pipe per lin ft. <br />.90 <br />Storm water inkbts each <br />13.00 <br />Marginal curb per lin ft. <br />Storm water inlets, complete each. <br />.40 <br />13.00 <br />Resetting inlets, each <br />3.00 <br />Resetting manhole covers, each <br />3.00 <br />Williston Construction Company <br />Talk per sq. ft. •20 <br />curb per lin ft. .6o <br />Grading per cu. yd. 1.00 <br />Asphalt Mexiian 2.82 <br />Asphalt Trinidad pr sq. yd. 3.02 <br />Asph. Conorete.using Mexican per sq. yd. 2.52 <br />Astih. Conorete using Trinidad per sq. yd. 2.70 <br />8 inch conduit pipe per lin ft. 1.00 <br />Storm, water inlets complete each 12.50 <br />Marginal curb per lin ft. •40 <br />Resetting inlets each 3.00 <br />Resenting manhole covers, each 3.00 <br />Pavement on Jackson Street <br />Bid of Reith Riley Construction Co. <br />Walk per sq. ft. .20 <br />Curb per lin ft. •60r <br />Grading per cu. yd. 1.00 <br />Sheet asphalt Natural Lake per sq. yd. 3.10 <br />Sheet asphaltMexiean per sq. yd. 2.80 <br />Oil Asphalt per sq. yd. 2.90 <br />Oil asphaltic concrete per sq. yd. 2.60 <br />7 inch conorete pavement per sq. yd. 2.37 <br />8 inch conduit pipe per lin ft. 1.00 <br />Storm water inle-us complete a%ch 15.00 <br />Marginal curb per lin ft. .40 <br />Resetting inlets, each 3.00 <br />Resetting manhole covers, each 3.00 <br />