My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/07/1923 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1923
>
08/07/1923 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 12:15:04 PM
Creation date
5/1/2018 11:53:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/7/1923
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
508 <br />srad+e.$ enrb and walk an Ewing <br />Avenue, <br />Bit -of <br />Whitcomb & Keller <br />Walk per �sq . -ft. <br />.20 <br />Grades ---curb --and va k on Jaen Street From mlAt St. is <br />-Eiw®od <br />Avona.e . <br />Bid -of <br />Whitcomb &. K-eherr* <br />Walk per sq. ft...& <br />Curb per `lin -fto <br />.3 <br />Grading per vu.. yd. <br />.85 _ <br />Pavement ion -ally =south -of `T-h aw 'Street from Chapin Street <br />to Laurel Street,: <br />Bid of <br />Hoban & Riach. <br />_- <br />'Grading per eu, yd. <br />$1,50 <br />7 ihgh concrete pavement per <br />sq-. yd. 2.75 <br />Chuck $100.00 <br />-PIPE SEDER ON O'Biren Streets <br />from Lincoln Way West to Vassar <br />Avenue* <br />Bid of <br />12 inch sewer per lin ft. <br />2.75 <br />6 inch sewer per-lin ft. <br />l X0 <br />8 inch sewer per ,tin ft. <br />.90 <br />,Manholes per Lft ft.. . <br />"Storm oa er inlets, -each ., <br />iianb-6114 orbs and covers Bath <br />Bid of I. W. Staples <br />12 inc}y sewer per lin ft. <br />8 .inch sewer per 1In ft. <br />6 inch sewer per tin ft. <br />.Manholes per lin ft,. <br />.Maxotol,es curbs and .+eevars, eawh <br />Storm �ebr inlets_, each <br />Check`$100.00 <br />Bid of Hoban & Roach <br />,12 inch sewer -per Iin ft. <br />a 8 inch sewer per lin ft. <br />6 inch sewer per lin ft. <br />Manholes per ft.,, <br />•Manhol.es _ eurbs and covers, " each <br />Storm water unlets, each <br />Lampheles complete <br />8.00 <br />10.00 <br />18.00 <br />2.~75 <br />'90 <br />8:00 <br />18.00 <br />10.00 <br />3.80 <br />.6o <br />1.00 <br />8.00 <br />18.90 <br />9.00 <br />9.00 <br />PIPE SEWER ON HUMBOLDT STREET FROM CLEVELAND AVENUE TO A ?DINT <br />184 FEET E. LINE' OF CLEVELAND AVENUE, <br />Bid of Hoban & .Reach, , <br />-10 inch sewer per lin ft. 3.00 <br />• 8 inch sewer per lin ft. .60 <br />6 insh•sewor per lin ft. 1.00 <br />-Manholes per ft. 7.00 <br />-Manholes curbs and covers, each 18.00 <br />•Storm water inlets, each 9.00 <br />Check 0100.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.