My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Task Order No 4 - Stantec Consulting Services Inc - LTCP Tasks
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Task Order No 4 - Stantec Consulting Services Inc - LTCP Tasks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 10:22:56 AM
Creation date
4/26/2018 2:52:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
regulators' May 2018 visit, CONSULTANT will prepare and submit to CLIENT a final version of the <br />updated deliverable. <br />Task 4.2: Post -Phase 1 Monitoring Support — CONSULTANT will provide technical and consulting <br />support to CLIENT related to the planning of the 12-month post -Phase 1 Monitoring Program required <br />under the CLIENT's existing LTCP. Two phases of activities are proposed. CONSULTANT will <br />perform Task 4.2.1 and review the results of the task with the CLIENT before proceeding with Tasks <br />4.2.2, 4.2.3, and 4.2.4. CONSULTANT will only perform Tasks 4.2.2, 4.2.3, and 4.2.4 upon CLIENT <br />authorization. <br />Task 4.2.1: Review Consent Decree Post -Phase 1 Monitoring Requirements — CONSULTANT <br />will review the CLIENT's existing Consent Decree and develop a list of the specific Post -Phase 1 <br />Monitoring tasks that must be completed to satisfy the requirements of the Consent Decree as <br />well as potential opportunities for using the monitoring program to support CLIENT's efforts to <br />obtain modifications to the Consent Decree. Where the CLIENT's existing Consent Decree is <br />unclear regarding the Post -Phase I monitoring requirements, CONSULTANT will provide <br />additional guidance from the USEPA's CSO Post Construction Compliance Monitoring Guidance <br />issued in 2012, other industry guidance. CONSULTANT will draft and distribute a technical <br />memorandum summarizing the Consent Decree requirements for Post -Phase I water quality <br />monitoring, and the recommended water quality data collection to both meet the Consent Decree <br />requirements, and to further the CLIENT goal of LTCP modification to the CLIENT and the <br />CLIENT's legal team for review. CONSULTANT will schedule and facilitate a meeting in South <br />Bend to review the memorandum and achieve consensus regarding the water quality monitoring <br />tasks. At that point, CLIENT will advise CONSULTANT whether services under Tasks 4.2.2, <br />4.2.3, and 4.2.4 are required. Following the meeting, CONSULTANT will provide an updated <br />technical memorandum to the CLIENT for transmittal to the Indiana Department of <br />Environmental Management (IDEM) and the United States Environmental Protection Agency <br />(USEPA) for review. <br />Task 4.2.1 Deliverable: Technical Memorandum — Post Phase 1 Water Quality Monitoring <br />Requirements and Recommendation. <br />Task 4.2.2: Assess Existing Monitoring Programs and Resources — If authorized by CLIENT, <br />CONSULTANT will coordinate the collection of information related to existing water quality <br />monitoring efforts and assess the adequacy of the programs for meeting the requirements of the <br />Post -Phase 1 Monitoring program. The CONSULTANT will review and evaluate CLIENT's <br />existing river water quality monitoring program, and other related programs identified by the <br />CLIENT. CONSULTANT will attend a meeting coordinated by the CLIENT, the Cities of <br />Elkhart and Mishawaka, and other agencies currently engaged in monitoring of conditions in the <br />St. Joseph River to assess existing regional water quality monitoring efforts. Key factors to be <br />considered in the assessment of the existing programs will include: <br />o Site location and configuration <br />o Type and frequency of data collected <br />o Quality of historic data collected <br />o Reliability of data collection system <br />o Suitability of data relative to the requirements for the monitoring program <br />o Modifications required to support the required data collection needs <br />20180417 <br />TO_04 LTCP Negotiation Support 20180417.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.