My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP Contract - Greater Impact Lawn Care - Lawn Maintenance and Mentorship Program
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
RFP Contract - Greater Impact Lawn Care - Lawn Maintenance and Mentorship Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 10:05:49 AM
Creation date
4/26/2018 2:44:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12. The Contractor is responsible for removing from each site and properly <br />disposing of all tree limbs of six (6) inch diameter and below, <br />13. The Owner shall be responsible for hauling limbs larger thian six (6) inches in <br />diameter from all areas. Contractor much notify Owner with location of limbs <br />larger than six (6) inches diameter. <br />14. All mulched areas, including tree rings, must not be damaged from mowing <br />operations. Damage to mulched areas must be repaired immediately. <br />15. The contractor shall avoid mowing under extremely wet conditions where <br />heavy equipment could rut the soil. <br />1:6. Contractor will ensure that all employees wear identifying shirt and hi-vis vest <br />at all times while present on properties, <br />17. The Owner shall be able to request additional services related to the care and <br />maintenance of the established properties at an additional cost as agreed upon <br />between Owner and Contractor. <br />5. Mentorship Program <br />E. Prevailing Specifications. None <br />F. Additions: <br />1. Contractor will ensure all youth employees that require a work permit have <br />obtained one. <br />2. Contractor will make "good faith" effort to create a diverse work force to <br />include race, ethnicity, and gender and be able to document policy. <br />3. Contractor will provide set of goals for the mentorship aspect of the program. <br />4. Contractor will incorporate the use of a short survey provide by the City at <br />specified points during the contract period to include the beginning, halfway <br />through, and the end. <br />5. The City reserves the right to change aspects of the mentorship program or add <br />or remove reporting requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.