Laserfiche WebLink
0 Appendix I <br />M1 AMERICA14 <br />0 <br />STRUCTUREPOINT <br />INC. <br />Environmental Engineering Category Rates <br />2017-2018 <br />CATEGORY HOURLY RATE <br />Principal <br />$290.00 <br />Senior Engineer <br />$220.00 <br />Project Manager <br />$205-00 <br />Project Engineer <br />$1160.00 <br />Staff Engineer <br />$110.00 <br />Senior Tech n ician/Desig ner <br />$135.00 <br />Sr. Environmental Specialist <br />$185.00 <br />Environmental Specialist <br />$115.010 <br />Staff Scientist <br />$70-00 <br />Senior Arch itect/P la niner <br />$165-00 <br />Project Architect/Planner <br />$,135.00 <br />StaffArchitect/Planner <br />$105.00 <br />Registered .and Surveyor <br />$160-00 <br />Survey Crew Chlief <br />$115.010 <br />Survey Crew Mem <br />$70.00 <br />Resident Proj. Rep. <br />$130.00 <br />Construction Inspector <br />$1 00.00 <br />Senior IT Consultant <br />$130.00 <br />IT Consultant <br />$,95,0,0 <br />Landscape Arch. <br />$80.,00 <br />Interns/Co-ops <br />$65.00, <br />Admiin/Clerical <br />$95.00 <br />201702407 <br />