My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Vietnam Veterans Memorial Relocation - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotations - Vietnam Veterans Memorial Relocation - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:17:02 AM
Creation date
4/26/2018 2:07:12 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0/' <br /># <br />CITY OF SOUTH BEND, INDIANA Cr <br />CONTRACTOR'S QUOMEOR PUBLIC WORK <br />PROJECT NAME: VIETNAM VETERANS MEMORIAL RELOCATION <br />PROJECT NO. 1'17-047-A <br />QUOTES DUE. April 24,2018 9:30am EST <br />(Must be completed for all quotes. Please type or print) <br />Date: April 24, 2018 Firm: Ziolkowski Construction, Inc. <br />Address: 4050 Ralph Jones Drive <br />City/State/dip: South Bend, IN 46628 Telephone Number: ( 574) 287-1811 <br />Agent of Bidder (if Applicable): n/a <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Vietnam Veterans Memorial Relocation <br />the City of South Bond, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated 4/10/18 ] - for the sum of (enter the Total Quote as shown on the Proposal) <br />Two Hundred _Fitt y-Five Thousand Seven Hundred Twenty (s 255,720 <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />A? -- <br />By 4-4-e—c _-1-1- <br />(Signature) <br />Bill Favors, President <br />(Printed Name of Person Signing) <br />The above quote is accepted this day of <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />Suzanna MI. Fritzberg, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />20 <br />Version 10/31/2017 Page - 7 Public Works Quote <br />117-047-A Vietnam Veterans Memorial Relocation <br />
The URL can be used to link to this page
Your browser does not support the video tag.