My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - 2017 Riverside Sidewalk & Driveway Project No 118-050 - Premium Concrete Services Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotations - 2017 Riverside Sidewalk & Driveway Project No 118-050 - Premium Concrete Services Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:02:13 AM
Creation date
4/26/2018 2:01:12 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
m fly <br />PROJECT NAME: 2017 Riverside Sidewalk & Drivewlqy_ <br />PROJECT NO. 118-050 <br />QUOTESDUE 24 April 2018,9:30AM <br />(Must be completed for all quotes. Please type or print) <br />Date: ql#741118 FirmPre lsv'l64 " 6007cldr- 5.or olc-e5 -7;1 e- <br />Address: -2 42 I&CAroo4 <br />City/State/Zip: E Telephone Number: (3-2q) <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material) necessary to complete the <br />public works project of: <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated for the sum of (enter the Total Quote as shown on, the Proposal) <br />-0 A I - 4011�0 - - <br />eve, -r"orgd h do 1141 (s 5`165 <br />(Enter Sum of Total Quote shown on Propos6l) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be, specifically referenced at the applicable page. <br />If additional units of material included in the, contract are needed, the cost of units must be, the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is_,Jo0be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />By <br />0-dr (Signature) <br />��4;lllll �- <br />(Printed Name of Person Signing) <br />ACCEPTANCE 14-1 <br />The above quote is accepted this day of 20 <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Glary A. Gilot, President Suzanna M. Fritzberg, Member <br />Elizabeth, A. Maradik, Member Therese J. Dorau, Member <br />James A. Mueller, Member Attest: Linda M. Martin, Clerk <br />Version 10/18/2016 Page - 1 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.