UZ01;LGRY-11 qDJ llva*]
<br />DIVISION A BASE BID — COLFAX AVENUE
<br />Jr
<br />1866
<br />Project Name Downtown South Bend
<br />Cross Streets, Phase 1
<br />Project No. 117-041A
<br />For Bids Due April 10, 2018
<br />ADDENDUM No. 2
<br />Item No,
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Construction Engineering
<br />1
<br />LS
<br />4,600.00
<br />$ 4,500.00
<br />2
<br />CPM Schedule
<br />1
<br />LS
<br />1,2010.00
<br />$ 1,200.00
<br />3
<br />CPM Schedule, Monthly
<br />6
<br />EA
<br />300.00
<br />$ 1,800.00
<br />4
<br />Maintaining Traffic
<br />I
<br />LS
<br />24,230.00
<br />$ 24,230.00
<br />5
<br />Video Record
<br />1
<br />LS
<br />1,200,00
<br />$ 11,200.00
<br />6
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />34,200.00
<br />$ 34,200.00
<br />7
<br />Clearing of Right of Way
<br />1
<br />LS
<br />52,500.00
<br />$ 52,500.00
<br />8
<br />Additional Common Excavation, Undistributed
<br />50
<br />CYS
<br />50.00
<br />$ 2,500.00
<br />9
<br />Suirface Milling, Asphalt, 1 1/2 IN
<br />930
<br />SYS
<br />7.00
<br />$1 6,510.00
<br />10
<br />Pavement, Remove
<br />1,556
<br />SYS
<br />9.00
<br />$ 14,004.00
<br />11
<br />Sidewalk, Concrete, Remove
<br />750
<br />SYS
<br />7.30
<br />$ 5,475.00
<br />12
<br />Curb, Concrete, Remove
<br />690
<br />LFT
<br />7,00
<br />$ 4,830,010
<br />13
<br />Remove & Salvage Cantilever Sign Structure,
<br />4
<br />EA
<br />500,00
<br />$ 2,000.00
<br />14
<br />Lightpole & Foundation, Remove
<br />5
<br />EA
<br />250.00
<br />$ 1,250.00
<br />15
<br />Tree Remove
<br />3
<br />EA
<br />240.00
<br />$ 720.00
<br />16
<br />Vault Closure — Griffon
<br />1
<br />LS
<br />27,000-010
<br />$ 27,000.00
<br />17
<br />Vauilt Closure — Palais Royale
<br />I
<br />LS
<br />22,800,00
<br />$ 22,8010.00
<br />18
<br />Vault Closure - Cinco
<br />1
<br />LS
<br />97,600.00
<br />$ 97,600,00
<br />19
<br />Vault Closure — Rotary Club
<br />1
<br />LS
<br />16,800.00
<br />$ 16,800.010
<br />20
<br />Vault Repair— LaSalle Grill
<br />1
<br />LS
<br />30,,000.00
<br />$ 30,000.00
<br />21
<br />Temporary Erosion Control
<br />1
<br />LS
<br />1'850.00
<br />$ 1,850.00
<br />22
<br />Temporary Iniet Protection
<br />10
<br />EA
<br />186.00
<br />$ 1,,850.00
<br />23
<br />Inlet, Type J-10
<br />4
<br />EA
<br />2,700,00
<br />$ 110,800.100
<br />24
<br />Manhole Type C-4
<br />1
<br />EA
<br />3,040.00
<br />$ 3,040,00
<br />26
<br />Storm Sewer Pipe, 12 IN
<br />502
<br />LFT
<br />56.00
<br />$1 28,112.00
<br />26
<br />Existing Brick Pavers, Remove and Reset
<br />20
<br />SYS
<br />310.010
<br />$ 6,200.00
<br />27
<br />Concrete Header, Remove
<br />290
<br />LFT
<br />10,00
<br />$ 2,900.00
<br />
|