Laserfiche WebLink
Project Development Costs Corby Blvd/Ironwood Dr/Rockne Dr Roundabout <br />City of South Bend Des. No. 1600074 <br />Project Development Services <br />Firm <br />Original Supp. 1 <br />Task Total <br />Task 1- Preliminary Engineering Services <br />$ <br />31,350.00 <br />LSUM <br />1. Abbreviated Engineering Report <br />LFA <br />1,200.00 <br />2. Abbreviated Engineering Report <br />ASI <br />$ <br />14,650.00 <br />3. Traffic Analysis <br />AS] <br />5,000.00 <br />4. Public Information Mtg <br />LFA/ASI <br />10,500.00 <br />$ <br />31,350.00 <br />Task 2 - Environmental Documentation - CE 2 <br />$ <br />38,100.00 <br />LSUM <br />1. Categorical Exclusion Development <br />ASI <br />$ <br />18,850.00 <br />2. Wetland Delination and Permitting <br />ASI <br />2,500.00 <br />3. Section 106 Documentation <br />ASI <br />16,750.00 <br />$ <br />38,100.00 <br />Task 3 - Topographic Survey Data Collection <br />LFA <br />$ <br />50,900.00 <br />= $ <br />50,900.00 <br />LSUM <br />Task 4 - Design Summary/Public Involvement <br />LFA/ASI <br />$ <br />15,400.00 <br />= $ <br />15,400.00 <br />LSUM <br />Task 5 - Road Design and Plan Development <br />$ <br />227,850.00 <br />LSUM <br />1. Project Plan Development [LFA/ASI] <br />LFA/ASI <br />$ <br />196,000.00 <br />2. Lighting Design <br />ASI <br />13,100.00 <br />3. Landscape/Streetscape Design <br />ASI <br />8,750.00 <br />4. Bid Period Services <br />LFA/ASI <br />5,000,00 <br />5. Pre -construction Conference <br />LFA/ASI <br />5,000.00 <br />$ <br />227,850.00 <br />Task 6 - Right-of-way Plan Development <br />$ <br />61,925.00 <br />UNIT <br />1. R/W Engineering <br />VSE <br />56,625.00 <br />2. R/W Staking <br />LFA <br />$ <br />5,300.00 <br />$ <br />61,925.00 <br />Task 7 - Utility Coordination Services <br />LFA <br />$ <br />10,000.00 <br />$ <br />34,200.00 <br />HNTE <br />1. Subsurface Utility Engineering <br />BHUG <br />$ 24,200.00 <br />Task 8 - Geotechnical Services <br />$ <br />23,100.00 <br />LSUM <br />1. Geotechnical Investigation <br />EEI <br />$ <br />11,500.00 <br />2. Pavement Design x 2 <br />ASI <br />11,500.00 <br />$ <br />23,100.00 <br />Task 9 - Construction Phase Services <br />LFA/ASI <br />10,000.00 <br />= $ <br />10,000.00 <br />HNTE <br />Total Amount <br />$ 468,625.00 $ 24,200.00 <br />$ 492,825.00 <br />[ASI] American Structurepoint <br />[LFA] Lawson -Fisher Associates P.C. LSUM = Lump Sum <br />[EEI] Earth Exploration Inc. HNTE = Hourly Not to Exceed <br />[VSE] VS Engineering Inc. UNIT = Estimated cost at Unit rate <br />[BHUG] Bloodhound Underground Utility Locators <br />