My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Christopher B Burke Engineering LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Christopher B Burke Engineering LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:18:07 AM
Creation date
4/26/2018 9:57:57 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
somm- <br />--was= <br />Y_`JCDCWM__ <br />h <br />ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of ("Effective Date") between <br />Board of Public Works, City of South Bend, Indiana ("Owner") and <br />Christwher.B. Burke Engineering, LLC (C1313EQ ("Engineer") <br />Owner's Project, of which Engineer's services under this Agreement are apart, is generally identified as <br />follows: <br />East Race Sewer Analysis (118.-034) ("Project"). <br />Engineer's Services under this Agreement are generally identified as follows: <br />SEE ATTACHED ENGINEER'S SCOPE OF SERVICES — ATTACHMENT A <br />Owner and Engineer further agree as follows: <br />1.01 Basic Agreement and Period oaf Service <br />A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or if required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner shall pay Engineer for its services as set forth in <br />Paragraphs 7.01 and 7,02. <br />B. Engineer shall complete its services within a reasonable time, or within the following specific time <br />period: <br />1. April 10, 2018 —Anticipated Notice to Proceed <br />2. April 17, 2018 — Complete Information and Data Gathering (City Assistance) <br />3. May 7,2018 —Complete existing and proposed conditions hydraulic model <br />4. May 18, 2018 — Complete technical memo with recommendation and cost estimate <br />Page I <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright C 2008 National Society of Professional Fngincers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.