Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name Tucker Drive <br />Project No. 116-118A <br />For Bids Due April 10, 2018 at 9:30 AM Local Time <br />BASE BID <br />pIJTit <br />�i�'y4 �2te7 f 'iW vtu3:. A• <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />$5,200.00 <br />$5,200.00 <br />1 <br />Construction Engineering <br />1 <br />LS <br />$10,110.00 <br />$10,110.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />$8,000.00 <br />$8,000.00 <br />3 <br />Clearing Right of Way <br />1 <br />LS <br />$7.00 <br />$9,989.00 <br />4 <br />Pavement Removal <br />1427 <br />SYS <br />$3.50 <br />$2,110.50 <br />5 <br />Curb, Concrete, Remove <br />603 <br />LFT <br />$14.00 <br />$19,054.00 <br />6 <br />Excavation, Common <br />1,361 <br />CYS <br />$100.00 <br />$500.00 <br />7 <br />Temporary Inlet Protection <br />5 <br />EACH <br />$2.51 <br />$753.00 <br />8 <br />Temporary Silt Fence <br />300 <br />LFT <br />$65.00 <br />$11,115.00 <br />9 <br />No. 2 Stone <br />171 <br />TON <br />$3.00 <br />$5,886.00 <br />10 <br />Subgrade Treatment, Type 1 <br />1962 <br />SYS <br />$25.00 <br />$13,675.00 <br />11 <br />Subgrade Treatment, Type If <br />547 <br />SYS <br />$131.00 <br />$9,170.00 <br />12 <br />B Borrow <br />70 <br />CYS <br />$51.00 <br />$15,555.00 <br />13 <br />Dense Graded Subbase <br />305 <br />CYS <br />$65.00 <br />$111,800.00 <br />14 <br />PCCP, 9 In. <br />1720 <br />SYS <br />$12.00 <br />$13,968.00 <br />15 <br />D-1 Contraction Joint <br />1164 <br />LFT <br />$21.00 <br />$12,978.00 <br />16 <br />Curb, Integral Concrete <br />618 <br />LFT <br />$500.00 <br />$1,000.00 <br />17 <br />Curb, Turnout <br />2 <br />EACH <br />$48.00 <br />$1,488.00 <br />18 <br />Gutter, Concrete A <br />31 <br />LFT <br />Bidder (Firm): Rieth Riley Construction Co. Inc. <br />Version 10/17/2017 Contractor's Bid for Public Works -15 <br />