Laserfiche WebLink
BIDIPROPOSAL"'�"' <br />CITY OF SOUTH BEND. r <br />Project Name Tucker Drive <br />Project No, 116-118A <br />For Bids Due April 10, 2018 at 9:30 AM Local Time <br />BASE BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />L5 <br />$4500.00 <br />$4500.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />$16,400.00 <br />$16,400.00 <br />3 <br />Clearing Right of Way <br />1 <br />LS <br />$8747.15 <br />$8747.15 <br />4 <br />Pavement Removal <br />1427 <br />SYS <br />$7 00 <br />$9989 00 <br />5 <br />Curb, Concrete, Remove <br />603 <br />LFT <br />$2.00 <br />$1206.00 <br />6 <br />Excavation, Common <br />1,361 <br />CYS <br />$15.00 <br />$20,415.00 <br />7 <br />Temporary Inlet Protection <br />5 <br />EACH <br />$100.00 <br />$500.00 <br />8 <br />Temporary Silt Fence <br />300 <br />LFT <br />$2.00 <br />$600.00 <br />9 <br />No. 2 Stone <br />171 <br />TON <br />$37.00 <br />$6327.00 <br />10 <br />Subgrade Treatment, Type 1 <br />1962 <br />SYS <br />$3.00 <br />$5886.00 <br />11 <br />Subgrade Treatment, Type 11 <br />547 <br />SYS <br />$10.00 <br />$5470.00 <br />12 <br />B Borrow <br />70 <br />CYS <br />$35.00 <br />$2450.00 <br />13 <br />Dense Graded Subbase <br />305 <br />CYS <br />$35.00 <br />$10,675.00 <br />14 <br />PCCP, 9 In. <br />1720 <br />SYS <br />$67.00 <br />$115,240.00 <br />15 <br />D-1 Contraction Joint <br />1164 <br />LFT <br />$11.50 <br />$13,386.00 <br />16 <br />Curb, Integral Concrete <br />618 <br />LFT <br />$28.00 <br />$17,304.00 <br />17 <br />Curb, Turnout <br />2 <br />EACH <br />$800.00 <br />$1600.00 <br />18 <br />Gutter, Concrete A <br />31 <br />LFT <br />$65.00 <br />$2015.00 <br />Bidder (Firm): C & E Excavating, Inc. <br />Version 10/17/2017 Contractor's Bid for Public Works - 15 <br />