My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec G - Three More or Less 2018 or Newer 28 Cubic Yard Front Loading Refuse Trucks - Pyramid Equipment
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Spec G - Three More or Less 2018 or Newer 28 Cubic Yard Front Loading Refuse Trucks - Pyramid Equipment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:38:55 AM
Creation date
4/26/2018 9:48:41 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E-Z Pack knows that their products lives a hard life and <br />that is one of the reasons that E-Z Pack powder coats <br />their products. Powder coat paint is 6 times more, <br />durable than the traditional wet paint process, giving, <br />you more value. <br />As a standard benefit from E-Z Pack, a protective <br />industrial grade undercoating is appfied to the body for <br />a long: service l,ife in all types of extreme weather <br />conditions. <br />Another advantage is that no electrical or hydraulic lines <br />are paint over for easy trouble shooting and cleaner <br />appearance. <br />Plus E-Z Pack's powder coat paint is environmentally <br />friel vs conventionall spray paint methods. <br />11111111 ill llllq�lllnr <br />Stage 1 Body cleaned, deburred, weld spatter and slag removed <br />Stage 2 Multi -stage chemicat treatment and h,igh pressure wash. <br />Stage 3 Apply Powder coat primer and finish coat <br />Stage 4 Bake Booth — 325 Degrees untill fully cured. <br />Stage 5 Apply ffidustrial Grade Undercoating to Body <br />Stage 6 Quality Control Inspection <br />Specification and Performance: <br />1 ) Dry film thickness is to be minimum 4 to 6 miIls coverage. <br />2) Paint must pass minimum 1250 hours salt spray test for corrosion <br />resistance. <br />3) Paint must pass UV test of 2000 hours for minimum loss of gloss <br />and collor shift. <br />4), Hydraulic cylinders and valves to be 1painted back semi -gloss. <br />5) Hose ends and hydraulic fittings to be anodized and remain <br />unpainted. <br />6) Hydraulic tubing to be zinc dichromate piated and unpainted, <br />Electrical harnesses, connections, switches, pneumatic tubing and <br />fittings to be weatherproof and remain unpainted, <br />
The URL can be used to link to this page
Your browser does not support the video tag.