My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec D - One or More 2018 or Newer 3-4 Ton Four Wheel Drive Pickup Trucks - Jordan Ford
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Spec D - One or More 2018 or Newer 3-4 Ton Four Wheel Drive Pickup Trucks - Jordan Ford
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:13:15 AM
Creation date
4/26/2018 9:28:03 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pr / _k rl�CJC__ #7 � <br />Aftemative �A@ff,- <br />d <br />Euel'Systems <br />Fresno, CA * Elkhart, IN <br />BI-FUEL CNG/Gasollne <br />Will Gutilla 559-289-8522 Al, NED <br />will@alalffuels.com 8100111VA <br />DATE QUOTE <br />3/19/2018 <br />180319WG2 <br />NAME ADDRESS <br />Deb Starkweather <br />Jordan Automotive Group <br />Mishawaka, IN <br />P.O. NO, <br />FORD DROP SHIP <br />TERMS <br />REP <br />END USER <br />FOB <br />88MNZ4 <br />Due on Completion <br />WG <br />South Bend <br />Elkhart, IN <br />ITEM <br />DESCRIPTION <br />QTY <br />PRICE EA. <br />EPA Certifled Bi-Fuel CNG/Gasoline System <br />F250-WIO-FM-BF <br />10 GGE 2019 Ford F-250 6,21L RegGab 4x4 <br />$9,400.00 <br />CNG Tanks Mounted Behind Rear Axle; OEM Gasoline Tank <br />Per Unit <br />Remains (Must Be Midship) <br />All items in "Alternate 4" section of South Bend bid sent by D <br />Starkweather on 3-16-18 are included, EXCEPT: <br />- Tanks to be installed are Type 1, not Type 4. <br />Tanks will amount to 10 GGE, not the required 20 GGE. <br />No methane detector is provided. It is not recommended on <br />this vehicle tyee. <br />Note: Quote is contingent on 2019 EPA certification. <br />Note: Quote is good 60 days and is FOB Elkhart, IN. <br />Note: CNG tanks will have approximately 1000psi upon completion. <br />Note: After receipt of purchase order, vehicle will be put into production schedule. <br />Note: After parts and vehicle arrive please allow 25 working days for delivery of first vehicle, and approximately 5 <br />days for each additional vehicle. <br />Note: Vehicle must be ordered with Ford's Gaseous Fuel Prep Engine option. <br />BUYER AUTHORIZATION . Buyer's signature below is acceptance to purchase the product identified above. <br />Signature---------------- ------------------------------------- ........... Date; ---------------------------------- <br />Lt. <br />floor P10, C� <br />
The URL can be used to link to this page
Your browser does not support the video tag.