Laserfiche WebLink
3. The cable shall be installed using the black wire for Load 1, the red wire for Load 2, the <br />white wire for Neutral, and the green wire for Earth Ground. <br />4. One (1) lineal foot of wiring as stated in the proposal includes four (4) separate size, <br />No. 4 AWG stranded copper wires. <br />5. One (1) lineal foot of wiring as stated in the proposal includes four (4) separate size, <br />No. 6 AWG stranded copper wires. <br />6. An additional 6 LFT of wire shall be coiled in each handhole, incidental to the cost. <br />7. Measurement and Payment <br />a. Payment for all costs of the wire installation, including the cost of all materials, <br />equipment, tools, labor, transportation, operations, and all other incidentals, <br />shall be paid for on a linear foot basis for Division A and B under the pay <br />items: <br />NO. 4 WIRE............................................................... ............. ....LFT <br />NO. 6 WIRE............................................................ .................... LFT <br />2.03 SPECIAL PROVISIONS, Page 57 Section LXXXV, Bollards, Decorative, Item B, No. 2 (i) <br />1. REVISE to read "Architectural Area Lighting Bollard, CB 12R-42IN CONCRETE <br />BODY MSB EXT, concrete body, or approved equal. Foundation for the Bollard shall be <br />minimum 42" below grade, to frost depth." <br />2.04 SPECIAL PROVISIONS, Page 58 Section LXXXVI, Lighted Bollard, Item B, No. 2 <br />1. REVISE line a. to read "Architectural Area Lighting Bollard, CB 12R42-CO-FLAT- <br />36LED-WW-3K-BL-MSB EXT-ML-BOLTS AHEAD WIRED 120-277, black powder <br />coated finish, or approved equal. Foundation for the Bollard shall be minimum 42" <br />below grade, to frost depth." <br />2. REVISE line b. to read "Architectural Area Lighting Bollard, CB 12R42-CO-FLAT- <br />36LED-WW-3K-BL-MSB EXT-ML-BOLTS AHEAD WIRED 120-277-GFI, black <br />powder coated finish, or approved equal. Foundation for the Bollard shall be minimum <br />42" below grade, to frost depth." <br />2.05 SPECIAL PROVISION, BID PROPOSAL <br />1. REVISE Alternate #1 — Deduct to Remove integral colored concrete from decorative <br />banding within Michigan Street Division B. (Integral color to remain within intersection <br />crosswalks). Addition of standard concrete to replace integral colored concrete. <br />2. REPLACE Bid Tabs for both Division A and Division B with attached document. Item <br />descriptions and quantities have been revised. <br />PART 3 — CONSTRUCTION DOCUMENTS <br />3.01 SHEET 19, LIGHTING PLAN — COLFAX AVE: <br />1. REPLACE sheet with attached plan sheet. Revisions to plan includes the addition of No. <br />6 wire callouts. <br />3.02 SHEET 20, LIGHTING PLAN — N MICHIGAN STREET: <br />1. REPLACE sheet with attached plan sheet. Revisions to plan includes the addition of No. <br />6 wire callouts and updated notes. <br />3.03 SHEET 21, LIGHTING NOTES & DETAILS: <br />1. REPLACE sheet with attached plan sheet. Revisions to include adding receptacles to <br />Tesco Diagrams. <br />3.04 SHEET 30, MISC CONSTRUCTION DETAILS <br />1. REPLACE sheet with attached detail sheet. Revisions include the addition of Lateral <br />Casing Detail. <br />Downtown Cross Street Improvements — Phase 1 Addendum #2 <br />April 5, 2018 Page 2 <br />