My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Downtown South Bend Cross Streets Improvements Phase I Proj No 117-041A - Walsh & Kelly, Inc - Financials Included, Not Scanned
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Downtown South Bend Cross Streets Improvements Phase I Proj No 117-041A - Walsh & Kelly, Inc - Financials Included, Not Scanned
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 2:39:35 PM
Creation date
4/26/2018 9:24:50 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. The cable shall be installed using the black wire for Load 1, the red wire for Load 2, the <br />white wire for Neutral, and the green wire for Earth Ground. <br />4. One (1) lineal foot of wiring as stated in the proposal includes four (4) separate size, <br />No. 4 AWG stranded copper wires. <br />5. One (1) lineal foot of wiring as stated in the proposal includes four (4) separate size, <br />No. 6 AWG stranded copper wires. <br />6. An additional 6 LFT of wire shall be coiled in each handhole, incidental to the cost. <br />7. Measurement and Payment <br />a. Payment for all costs of the wire installation, including the cost of all materials, <br />equipment, tools, labor, transportation, operations, and all other incidentals, <br />shall be paid for on a linear foot basis for Division A and B under the pay <br />items: <br />NO. 4 WIRE............................................................... ............. ....LFT <br />NO. 6 WIRE............................................................ .................... LFT <br />2.03 SPECIAL PROVISIONS, Page 57 Section LXXXV, Bollards, Decorative, Item B, No. 2 (i) <br />1. REVISE to read "Architectural Area Lighting Bollard, CB 12R-42IN CONCRETE <br />BODY MSB EXT, concrete body, or approved equal. Foundation for the Bollard shall be <br />minimum 42" below grade, to frost depth." <br />2.04 SPECIAL PROVISIONS, Page 58 Section LXXXVI, Lighted Bollard, Item B, No. 2 <br />1. REVISE line a. to read "Architectural Area Lighting Bollard, CB 12R42-CO-FLAT- <br />36LED-WW-3K-BL-MSB EXT-ML-BOLTS AHEAD WIRED 120-277, black powder <br />coated finish, or approved equal. Foundation for the Bollard shall be minimum 42" <br />below grade, to frost depth." <br />2. REVISE line b. to read "Architectural Area Lighting Bollard, CB 12R42-CO-FLAT- <br />36LED-WW-3K-BL-MSB EXT-ML-BOLTS AHEAD WIRED 120-277-GFI, black <br />powder coated finish, or approved equal. Foundation for the Bollard shall be minimum <br />42" below grade, to frost depth." <br />2.05 SPECIAL PROVISION, BID PROPOSAL <br />1. REVISE Alternate #1 — Deduct to Remove integral colored concrete from decorative <br />banding within Michigan Street Division B. (Integral color to remain within intersection <br />crosswalks). Addition of standard concrete to replace integral colored concrete. <br />2. REPLACE Bid Tabs for both Division A and Division B with attached document. Item <br />descriptions and quantities have been revised. <br />PART 3 — CONSTRUCTION DOCUMENTS <br />3.01 SHEET 19, LIGHTING PLAN — COLFAX AVE: <br />1. REPLACE sheet with attached plan sheet. Revisions to plan includes the addition of No. <br />6 wire callouts. <br />3.02 SHEET 20, LIGHTING PLAN — N MICHIGAN STREET: <br />1. REPLACE sheet with attached plan sheet. Revisions to plan includes the addition of No. <br />6 wire callouts and updated notes. <br />3.03 SHEET 21, LIGHTING NOTES & DETAILS: <br />1. REPLACE sheet with attached plan sheet. Revisions to include adding receptacles to <br />Tesco Diagrams. <br />3.04 SHEET 30, MISC CONSTRUCTION DETAILS <br />1. REPLACE sheet with attached detail sheet. Revisions include the addition of Lateral <br />Casing Detail. <br />Downtown Cross Street Improvements — Phase 1 Addendum #2 <br />April 5, 2018 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.