Laserfiche WebLink
h <br />BIDtPROPOSAIL CITY OFSOUTI-1 BEND <br />Project Name Downtown South Bend <br />Cross Streets, Phase I <br />Project No. 117-041A <br />For Bids Due April 10, 2018 <br />DIVISION A BASE BID —'COLFAX AVENUE ADDENDUM No, 2 <br />Itern No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />4,500.00 <br />$ 4,500,00 <br />2 <br />CPM Schedule <br />1 <br />LS <br />1,200,00 <br />$ 1,200.00 <br />3 <br />CPM Schedule, Monthly <br />6 <br />EA <br />300.00 <br />$ 1,800.00 <br />,4 <br />Maintaining Traffic <br />1 <br />LS <br />24,230.00 <br />$ 24,230.00 <br />5 <br />Video Record <br />1 <br />LS <br />1,200.00 <br />$ 1,200.00 <br />6 <br />Mobilization and Demobilization <br />1 <br />LS <br />34,200.010 <br />$ 34,200.00 <br />7 <br />Clearing of Right of Way <br />1 <br />LS <br />52,500.00 <br />$ 52,500,00 <br />8 <br />Additiional Common Excavation, Undistributed <br />50 <br />CYS <br />50.00 <br />$1 2,500.00 <br />9 <br />Surface Milling, Asphalt, 1 1/2 IN <br />930 <br />SYS <br />7.00 <br />$ 6,5110.00 <br />10 <br />Pavement, Remove <br />1,556 <br />SYS <br />9,00 <br />$ 14,004,00 <br />11 <br />Sidewalk, Concrete, Remove <br />750 <br />SYS <br />7.30 <br />$ 5,475.00 <br />12 <br />Curb, Concrete, Remove <br />690 <br />LFT <br />7.00 <br />$ 4,830.00 <br />13 <br />Remove & Salvage Cantilever Sign Structure, <br />4 <br />EA <br />600.00 <br />$ 2,000.00 <br />14 <br />LightpoIe & Foundation, Remove <br />5 <br />EA <br />260.00 <br />$ 1,250.00 <br />15 <br />Tree Remove <br />3 <br />EA <br />240,00 <br />$ 720.00 <br />16 <br />Vault Closure — Griffon <br />1 <br />LS <br />27,000.00 <br />$ 27,000.00 <br />17 <br />Vault Closure — PaWs Royale <br />1 <br />LS <br />22,8010.00 <br />$ 22,800.00 <br />18 <br />Vauilt Closure - Cinc'o <br />1 <br />LS <br />97,6010.00 <br />$ 97,600.00 <br />19 <br />�Vault Closure — Rotary Club <br />1 <br />LS <br />16,800.00 <br />$ 16,800.00 <br />20 <br />Vault Repair — LaSalle 'chill <br />1 <br />LS <br />300010.00 <br />$ 30,000,00 <br />21 <br />Temporary Erosion Control <br />1 <br />LS <br />1,850,010 <br />$ 1,850.00 <br />22 <br />Temporary Inlet Protection <br />10 <br />EA <br />185.00 <br />$ 1,850.00 <br />23 <br />Inlet, Type J-10 <br />4 <br />EA <br />2,700.00 <br />$ 10,800.00 <br />24 <br />Manhole Type C-4 <br />1 <br />EA <br />3,040.010 <br />$ 3,040.00 <br />25 <br />Storm Sewer Pipe, 12 IN <br />502 <br />LFT <br />56.00 <br />$ 2�8,112.00 <br />2�6 <br />Existing Brick Pavers, Remove and Reset <br />20 <br />SYS <br />310.00 <br />$ 6,2010.00 <br />27 <br />Concrete Header, Remove <br />290 <br />LFT <br />10.00 <br />$ 2,900.00 <br />